The preemptive resource allocation problem

被引:1
|
作者
Sarpatwar, Kanthi [1 ]
Schieber, Baruch [2 ]
Shachnai, Hadas [3 ]
机构
[1] IBM TJ Watson Res Ctr, Yorktown Hts, NY 10598 USA
[2] New Jersey Inst Technol, Comp Sci Dept, Newark, NJ USA
[3] Technion, Comp Sci Dept, Haifa, Israel
关键词
Machine scheduling; Resource allocation; Vector packing; Approximation algorithms; APPROXIMATION ALGORITHMS; ADVERTISEMENTS; MINIMIZATION; PLACEMENT;
D O I
10.1007/s10951-023-00786-6
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We revisit a classical scheduling model to incorporate modern trends in data center networks and cloud services. Addressing some key challenges in the allocation of shared resources to user requests (jobs) in such settings, we consider the following variants of the classic resource allocation problem (RAP). The input to our problems is a set J of jobs and a set M of homogeneous hosts, each has an available amount of some resource. Assuming that time is slotted, a job is associated with a release time, a due date, a weight and a given length, as well as its resource requirement. A feasible schedule is an allocation of the resource to a subset of the jobs, satisfying the job release times/due dates as well as the resource constraints. A crucial distinction between classic RAP and our problems is that we allow preemption and migration of jobs, motivated by virtualization techniques. We consider two natural objectives: throughput maximization (MaxT), which seeks a maximum weight subset of the jobs that can be feasibly scheduled on the hosts in M, and resource minimization (MinR), that is finding the minimum number of (homogeneous) hosts needed to feasibly schedule all jobs. Both problems are known to be NP-hard. We first present an Omega(1)-approximation algorithm for MaxT instances where time-windows form a laminar family of intervals. We then extend the algorithm to handle instances with arbitrary time-windows, assuming there is sufficient slack for each job to be completed. For MinR we study a more general setting with d resources and derive an O(log d)-approximation for any fixed d >= 1, under the assumption that time-windows are not too small. This assumption can be removed leading to a slightly worse ratio of O(log d log* T), where T is the maximum due date of any job.
引用
收藏
页码:103 / 118
页数:16
相关论文
共 50 条
  • [1] The preemptive resource allocation problem
    Kanthi Sarpatwar
    Baruch Schieber
    Hadas Shachnai
    Journal of Scheduling, 2024, 27 : 103 - 118
  • [2] Preemptive cloud resource allocation modeling of processing jobs
    Vakilinia, Shahin
    Cheriet, Mohamed
    JOURNAL OF SUPERCOMPUTING, 2018, 74 (05): : 2116 - 2150
  • [3] Preemptive cloud resource allocation modeling of processing jobs
    Shahin Vakilinia
    Mohamed Cheriet
    The Journal of Supercomputing, 2018, 74 : 2116 - 2150
  • [4] Brief Announcement: Approximation Algorithms for Preemptive Resource Allocation
    Sarpatwar, Kanthi
    Schieber, Baruch
    Shachnai, Hadas
    SPAA'18: PROCEEDINGS OF THE 30TH ACM SYMPOSIUM ON PARALLELISM IN ALGORITHMS AND ARCHITECTURES, 2018, : 343 - 345
  • [5] A RESOURCE ALLOCATION PROBLEM
    LITSIOS, S
    OPERATIONS RESEARCH, 1965, S 13 : B71 - &
  • [6] A RESOURCE ALLOCATION PROBLEM
    LITSIOS, S
    OPERATIONS RESEARCH, 1965, 13 (06) : 960 - &
  • [7] A RESOURCE-ALLOCATION PROBLEM
    WHITTAKER, JC
    CANNINGS, C
    JOURNAL OF THEORETICAL BIOLOGY, 1994, 167 (04) : 397 - 405
  • [8] PROBLEM OF OPTIMAL RESOURCE ALLOCATION
    RAZUMIKH.BS
    AUTOMATION AND REMOTE CONTROL, 1965, 26 (07) : 1216 - &
  • [9] PROBLEM OF SPATIAL RESOURCE ALLOCATION
    HANSEN, NM
    GROWTH AND CHANGE, 1971, 2 (02) : 22 - 24
  • [10] A preemptive bound for the Resource Constrained Project Scheduling Problem
    Haouari, Mohamed
    Kooli, Anis
    Neron, Emmanuel
    Carlier, Jacques
    JOURNAL OF SCHEDULING, 2014, 17 (03) : 237 - 248