Assembly line balancing problem with ergonomics: a new fatigue and recovery model

被引:28
作者
Abdous, Mohammed-Amine [1 ]
Delorme, Xavier [2 ]
Battini, Daria [3 ]
Sgarbossa, Fabio [4 ]
Berger-Douce, Sandrine [5 ]
机构
[1] Univ Lille, IMT Nord Europe, Inst Mines Telecom, Ctr Digital Syst, F-59000 Lille, France
[2] Univ Clermont Auvergne, CNRS, INP Clermont Auvergne, Mines St Etienne,UMR 6158,LIMOS, F-42023 St Etienne, France
[3] Univ Padua, Dept Management & Engn, Stradella San Nicola 3, I-36100 Vicenza, Italy
[4] Norwegian Univ Sci & Technol, Dept Mech & Ind Engn, Trondheim, Norway
[5] Univ Lyon, Mines St Etienne, Univ Lumiere Lyon 2, Univ Jean Monnet,UR COACTIS,Inst Henri Fayol, F-42023 St Etienne, France
关键词
Assembly line balancing problem; design of manufacturing systems; ergonomics; exact algorithm; fatigue and recovery model; MUSCULOSKELETAL DISORDERS; JOB ROTATION; REMEMBER ALGORITHM; PHYSICAL WORKLOAD; DESIGN; ASSIGNMENT; BRANCH; RISKS; OPTIMIZATION; QUALITY;
D O I
10.1080/00207543.2021.2015081
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Assembly lines are production lines used to manufacture products, ranging from mass-production products to mass-customisation with low unit products. Assembly lines consume the largest parts of investment funds and involve the largest proportion of companies' labour force. However, workers in assembly lines are exposed to work-related musculoskeletal disorders (MSDs) and ergonomics problems. Poor distribution of workloads reduces the performance of assembly lines and causes workers MSDs and injuries, largely affecting the economics of production systems and resulting in high workers' compensation and absenteeism costs. Furthermore, ergonomics problems and MSDs impact product quality and decrease productivity. We propose a methodology for taking physical ergonomics into account as early as in the design phase of assembly lines. This methodology is based on Integer Linear Programming for the assembly line balancing problem with consideration of ergonomics with a quantitative fatigue and recovery criterion. As solving approach, we develop a dedicated exact algorithm, denoted Iterative Dichotomic Search, to solve low and medium-size instances of the problem. We validate our approach by proposing numerical experiments and analysis on instances from the literature.
引用
收藏
页码:693 / 706
页数:14
相关论文
共 50 条
[21]   A MILP model for the Accessibility Windows Assembly Line Balancing Problem (AWALBP) [J].
Calleja, Gema ;
Corominas, Albert ;
Garcia-Villoria, Alberto ;
Pastor, Rafael .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (12) :3549-3560
[22]   An Optimization Model for Assembly Line Balancing Problem with Uncertain Cycle Time [J].
Cao, Yong ;
Li, Yuan ;
Liu, Qinghua ;
Zhang, Jie .
MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020
[23]   Mixed-model assembly line balancing problem with tasks assignment [J].
Dziki, K. ;
Krenczyk, D. .
MODERN TECHNOLOGIES IN INDUSTRIAL ENGINEERING VII (MODTECH2019), 2019, 591
[24]   A Review on Collaborative Robot Assembly Line Balancing Problems [J].
Kheirabadi, M. ;
Keivanpour, S. ;
Chinniah, Y. ;
Frayret, J. M. .
IFAC PAPERSONLINE, 2022, 55 (10) :2779-2784
[25]   A fuzzy assembly line balancing problem with physical workload constraints [J].
Mutlu, Ozcan ;
Ozgormus, Elif .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (18) :5281-5291
[26]   AN ASSEMBLY LINE BALANCING PROBLEM AUTOMOTIVE CABLES [J].
Triki, Hager ;
Hachicha, Wafik ;
Mellouli, Ahmed ;
Masmoudi, Faouzi .
MANAGEMENT AND PRODUCTION ENGINEERING REVIEW, 2015, 6 (01) :59-66
[27]   A mathematical model and ant colony algorithm for multi-manned assembly line balancing problem [J].
Fattahi, Parviz ;
Roshani, Abdolreza ;
Roshani, Abdolhassan .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 53 (1-4) :363-378
[28]   Assembly line balancing with parallel workstations [J].
alvarez-Miranda, Eduardo ;
Chace, Sebastian ;
Pereira, Jordi .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (21) :6486-6506
[29]   Assembly line balancing in garment industry [J].
Chen, James C. ;
Chen, Chun-Chieh ;
Su, Ling-Huey ;
Wu, Han-Bin ;
Sun, Cheng-Ju .
EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (11) :10073-10081
[30]   Multi-manned Assembly Line Balancing Problem with Skilled Workers: A New Mathematical Formulation [J].
Giglio, Davide ;
Paolucci, Massimo ;
Roshani, Abdolreza ;
Tonelli, Flavio .
IFAC PAPERSONLINE, 2017, 50 (01) :1211-1216