Lean construction: Implementing the Last Planner System on mining projects

被引:0
|
作者
Govindasamy, T. [1 ]
Bekker, M. C. [1 ]
机构
[1] Univ Pretoria, Grad Sch Technol Management, Pretoria, South Africa
关键词
Last Planner System (LPS); success factors; earned value management (EVM); construction; PERFORMANCE; THINKING;
D O I
10.17159/2411-9717/1695/2024
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
The potential benefits of implementing the Last Planner System (LPS) on mining infrastructure projects were explored through two case studies in the South African mining industry. The first part of the study involved measurement of the impact of LPS through earned value techniques on secondary project data. The second part sought to establish the lean construction success factors leading to improvements in construction performance. This was done by means of a research questionnaire distributed to the project owner's teams, contracted parties, and the LPS facilitators. The results revealed a positive correlation between LPS application and planned percentage complete. However, the performance achieved during the LPS pilot was not sustained. The success factors and benefits considered most evident in the case study pilot differed among the three stakeholder groups. The findings are expected to guide construction stakeholders to better define performance measures and focus on factors required to make LPS implementation more effective in the South African mining sector.
引用
收藏
页码:15 / 24
页数:10
相关论文
共 50 条
  • [1] Lean Construction in the UAE: Implementation of Last Planner System®
    Warid, Osama
    Hamani, Karima
    Lean Construction Journal, 2023, 2023 : 01 - 20
  • [2] Research on the Emergence Mechanism of Last Planner System of Lean Construction
    Zhu Kongguo
    26TH CHINESE CONTROL AND DECISION CONFERENCE (2014 CCDC), 2014, : 3643 - 3646
  • [3] Last planner system oriented to lean construction: A literature review
    Han, Mei-Gui
    Wang, Zhuo-Fu
    Jin, De-Zhi
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2012, 32 (04): : 721 - 730
  • [4] Takt Complementing Last Planner® System on Residential Construction Projects
    Power, William
    Sinnott, Derek
    Lynch, Patrick
    CONSTRUCTION ECONOMICS AND BUILDING, 2024, 24 (4-5): : 58 - 80
  • [5] The contributions of the Last Planner System to resilient performance in construction projects
    Hamerski, Douglas Comassetto
    Saurin, Tarcisio Abreu
    Formoso, Carlos Torres
    Isatto, Eduardo Luis
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2024, 42 (04) : 328 - 345
  • [6] Application of the Last Planner System in Schedule Management of Construction Projects
    Jin, Junyan
    CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1777 - 1781
  • [7] A survey on production planning system in construction projects based on Last Planner System
    Ha Duy Khanh
    Kim, Soo Yong
    KSCE JOURNAL OF CIVIL ENGINEERING, 2016, 20 (01) : 1 - 11
  • [8] A survey on production planning system in construction projects based on Last Planner System
    Ha Duy Khanh
    Soo Yong Kim
    KSCE Journal of Civil Engineering, 2016, 20 : 1 - 11
  • [9] Effective Implementation of Last Planner System in Construction Projects: A Case Study
    Gjerde, M. R. D.
    Ratnayake, R. M. C.
    Samarakoon, S. M. S. M. K.
    2019 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2019, : 1139 - 1144
  • [10] Last planner system in construction
    Cwik, Katarzyna
    Roslon, Jerzy
    RSP 2017 - XXVI R-S-P SEMINAR 2017 THEORETICAL FOUNDATION OF CIVIL ENGINEERING, 2017, 117