Key technical innovations in the construction of Baihetan Hydropower Station Project

被引:2
作者
Wang, Zhilin [1 ]
Zhang, Bingliu [1 ]
机构
[1] China Three Gorges Construct Engn Corp, Baihetan Project Construc Dept, Ningnan 615421, Peoples R China
关键词
ultra-high arch dam; columnar jointed basalt; low-heat cement concrete; temperature controlled crack prevention; million-kilowatt unit; intelligent construction;
D O I
10.1007/s42524-023-0253-5
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:367 / 372
页数:6
相关论文
empty
未找到相关数据