A novel shipyard performance measurement approach through an integrated Value Engineering and Risk Assessment (VENRA) framework using a hybrid MCDM tool

被引:1
|
作者
Baihaqi, Imam [1 ,2 ]
Lazakis, Iraklis [1 ]
Supomo, Heri [2 ]
机构
[1] Univ Strathclyde, Dept Naval Architecture Ocean & Marine Engn, 100 Montrose St, Glasgow G4 0LZ, Scotland
[2] Inst Teknol Sepuluh Nopember, Dept Naval Architecture & Shipbldg Engn, Fac Marine Technol, Surabaya, Indonesia
关键词
Shipyard; performance measurement; shipbuilding; ship repair; value engineering; risk assessment; fuzzy DEMATEL; WET; business elements; BALANCED SCORECARD; FUZZY; CHINA; COMPETITIVENESS; QUALITY; SYSTEM; MODEL;
D O I
10.1177/14750902231219533
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
As the ship manufacturer, including new building, repair, and conversion, the shipyard significantly impacts the ship's quality and performance output. A well-planned ship design that will be built requires skilled shipbuilders who can fulfil quality, timeline, budget, safety, and environmental requirements from shipowners, rules, and regulations. Since diverse and multiple factors influence its efficiency and product output, evaluating the shipyard's performance is critical for a more impactful and strategic advancement approach. This research aims to apply the novel integrated Value Engineering and Risk Assessment (VENRA) framework, which integrates five main elements: technical, business, external, personnel's safety, and environment, for measuring shipyard performance. This paper demonstrates the VENRA business element in more detail and applies it to a shipyard case study. Integrated fuzzy Decision Making Trial and Evaluation Laboratory (DEMATEL) and Weighted Evaluation Technique (WET) are used to analyse the criteria's interrelationship by determining the cause-effect group and weight ranking prioritisation. The objective grading system is developed to determine the shipyard's performance score based on multi-resource qualitative and quantitative data. The shipyard's case study demonstrates that 'delivery time' remains the most critical and influential aspect of the business elements' performance. In addition, the top three most important factors, 'delivery time', 'financial report condition', and 'ship manufacturing cost', must be taken into account, as they directly influence the shipyard's performance. Despite being a minor element, 'innovation and human resources' is the second most influential factor after 'delivery time'. The case study's results demonstrate that the framework can simultaneously identify cause-and-effect criteria groups while prioritising the most critical factors via methodologies.
引用
收藏
页码:911 / 932
页数:22
相关论文
共 11 条
  • [1] Development of a novel integrated value engineering and risk assessment (VENRA) framework for shipyard performance measurement: a case study for an Indonesian shipyard
    Baihaqi, Imam
    Lazakis, Iraklis
    Kurt, Rafet Emek
    SHIPS AND OFFSHORE STRUCTURES, 2024, 19 (08) : 1118 - 1133
  • [2] Integrated Value Engineering and Risk Assessment Performance Measurement Framework in Ship-Manufacturing Industry towards Net Zero Emissions Using Fuzzy DEMATEL-AHP
    Baihaqi, Imam
    Lazakis, Iraklis
    Supomo, Heri
    MACHINES, 2023, 11 (08)
  • [3] Assessing performance measurement indicators for ship manufacturing industry through value engineering and risk assessment model
    Baihaqi, I.
    Lazakis, I.
    Kurt, R. E.
    TRENDS IN MARITIME TECHNOLOGY AND ENGINEERING, MARTECH 2022, VOL 1, 2022, 8 : 25 - 32
  • [4] Risk assessment of renewable energy projects using a novel hybrid fuzzy approach
    Karamoozian, Amirhossein
    Wu, Desheng
    Luo, Cuicui
    INTERNATIONAL JOURNAL OF GREEN ENERGY, 2023, 20 (14) : 1597 - 1611
  • [5] Function matters: Development of a value engineering building-function-assessment framework from stakeholders' perspectives using hybrid analytical methods
    Liang, Qi
    Liang, Hong
    Li, Qin
    Tam, Vivian W. Y.
    Yu, Jingyu
    Zhu, Lin
    JOURNAL OF BUILDING ENGINEERING, 2023, 68
  • [6] A fully data-driven FMEA framework for risk assessment on manufacturing processes using a hybrid approach
    Ervural, Bilal
    Ayaz, Halil Ibrahim
    ENGINEERING FAILURE ANALYSIS, 2023, 152
  • [7] A Novel Risk Assessment Approach Using a Hybrid Method Based on Fine-Kinney and Extended MCDM Methods Under Interval-Valued Intuitionistic Fuzzy Environment
    Seker, Sukran
    INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY & DECISION MAKING, 2022, 21 (05) : 1591 - 1616
  • [8] A framework for identifying priority areas through integrated eco-environmental risk assessment for a holistic watershed management approach
    Li, Hualin
    Zhang, Shouhong
    Zhang, Jianjun
    Zhang, Wenlong
    Song, Zhuoyuan
    Yu, Peidan
    Xie, Chenxin
    ECOLOGICAL INDICATORS, 2023, 146
  • [9] A Novel Risk Assessment Approach for Open-Cast Coal Mines Using Hybrid MCDM Models with Interval Type-2 Fuzzy Sets: A Case Study in Türkiye
    Mutlu, Mert
    Cetin, Nazli Ceren
    Onder, Seyhan
    SYSTEMS, 2024, 12 (08):
  • [10] A Novel Relaying Approach for Performance Enhancement in a STATCOM Integrated Wind-Fed Transmission Line Using Single-Terminal Measurement
    Mishra, S. K.
    Tripathy, L. N.
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF ELECTRICAL ENGINEERING, 2020, 44 (02) : 897 - 910