Waste recycling through a decentralized network of mobile facilities

被引:5
作者
Alarcon-Gerbier, Eduardo [1 ]
Linss, Florian [1 ]
Buscher, Udo [1 ]
机构
[1] Tech Univ Dresden, Chair Business Adm, Esp Ind Management, Helmholtzstr 10, D-01069 Dresden, Germany
关键词
Facility location problem; Mobile production unit; Production-routing problem; Optimization; Waste management; LOCATION-ROUTING PROBLEM; ROBUST OPTIMIZATION APPROACH; INVENTORY; DESIGN; RELAXATIONS; HEURISTICS; ALGORITHMS; BIOFUEL; MODEL; PART;
D O I
10.1016/j.jclepro.2023.137773
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Mobile and modular recycling facilities have been developed in recent years, which can promote both the expansion of recycling capacity and the decentralization of waste treatment. Due to the miniaturization of these recycling units and their installation in standard containers, it is possible to relocate them from site to site at short notice, allowing for a more agile response to spatial and temporal waste generation. The planning of such a network involves the integration of location, production, and transport decisions. Therefore, this article presents a mixed-integer programming model to plan the relocation of the mobile recycling units so that the total costs of transport, recycling, and facility relocation are minimized. In addition, the economic value and environmental impact of mobile recycling networks are investigated through a sensitivity analysis, showing the benefit of movable recycling capacities. A case study analysis reveals that deploying modular units reduces overall recycling costs by about 10%, although extra costs are required to operate and relocate the mobile recycling units.
引用
收藏
页数:11
相关论文
共 47 条
[1]   Formulations and Branch-and-Cut Algorithms for Multivehicle Production and Inventory Routing Problems [J].
Adulyasak, Yossiri ;
Cordeau, Jean-Francois ;
Jans, Raf .
INFORMS JOURNAL ON COMPUTING, 2014, 26 (01) :103-120
[2]   Modular and mobile facility location problems: A systematic review [J].
Alarcon-Gerbier, Eduardo ;
Buscher, Udo .
COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 173
[3]   Software-Defined Mobile Supply Chains: Rebalancing Resilience and Efficiency in Production Systems [J].
Alarcon-Gerbier, Eduardo ;
Chokparova, Zarina ;
Ghondaghsaz, Nassim ;
Zhao, Wanqi ;
Shahmoradi-Moghadam, Hani ;
Assmann, Uwe ;
Oruc, Orcun .
SUSTAINABILITY, 2022, 14 (05)
[4]   Minimizing Movements in Location Problems with Mobile Recycling Units [J].
Alarcon-Gerbier, Eduardo ;
Buscher, Udo .
COMPUTATIONAL LOGISTICS, ICCL 2020, 2020, 12433 :396-411
[5]   Biomass waste-to-energy supply chain optimization with mobile production modules [J].
Allman, Andrew ;
Lee, Che ;
Martin, Mariano ;
Zhang, Qi .
COMPUTERS & CHEMICAL ENGINEERING, 2021, 150 (150)
[6]   A new model for the hazardous waste location-routing problem [J].
Alumur, Sibel ;
Kara, Bahar Y. .
COMPUTERS & OPERATIONS RESEARCH, 2007, 34 (05) :1406-1423
[7]  
[Anonymous], 2022, PV magazine
[8]   Tabu search with path relinking for an integrated production-distribution problem [J].
Armentano, V. A. ;
Shiguemoto, A. L. ;
Lokketangen, A. .
COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (08) :1199-1209
[9]   A profit-oriented mathematical model for hazardous waste locating-routing problem [J].
Aydemir-Karadag, Ayyuce .
JOURNAL OF CLEANER PRODUCTION, 2018, 202 :213-225
[10]   Heuristics for a multiperiod inventory routing problem with production decisions [J].
Bard, Jonathan F. ;
Nananukul, Narameth .
COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 57 (03) :713-723