- [41] Schedule-cost Joint Management of Thermal Power Construction Project Based on Improved Earned Value Method PROCEEDINGS OF THE 2017 3RD INTERNATIONAL CONFERENCE ON HUMANITIES AND SOCIAL SCIENCE RESEARCH (ICHSSR 2017), 2017, 121 : 35 - 39
- [42] Consolidate Earned Value Principle with Integrated Cost Management - On Project Budget Control during Construction and Investment Period CALL OF PAPER PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, 2008, : 1181 - 1185
- [43] Using the Random Tree Classifier to Improve the Project's Cost Predictability in the Earned Value Management: An Empirical Study 16TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY-NEW GENERATIONS (ITNG 2019), 2019, 800 : 589 - 592
- [44] Using the Naive Bayes Classifier to Improve the Project's Cost Predictability in the Earned Value Management - An Empirical Study PROCEEDINGS OF THE 14TH BRAZILIAN SYMPOSIUM ON INFORMATION SYSTEMS (SBSI2018), 2018, : 278 - 284
- [45] Duration Estimate at Completion: Improving Earned Value Management Forecasting Accuracy KSCE Journal of Civil Engineering, 2020, 24 : 693 - 702
- [48] RESEARCH ON THE EARNED VALUE MANAGEMENT SYSTEM APPLIED IN CONSULTANCY PROJECT PERFORMANCE JOURNAL OF MARINE SCIENCE AND TECHNOLOGY-TAIWAN, 2015, 23 (01): : 21 - 35
- [49] "KAIZEN" (Improvement) in Spacecraft Project Management using "Earned Value Analysis" JOURNAL OF SPACECRAFT TECHNOLOGY, 2011, 21 (01): : 21 - 30
- [50] Using the Earned Value Management System to Improve Electrical Project Control JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2012, 138 (03): : 449 - 457