Comparison of the Stability and Accuracy of Deterministic Project Cost Prediction Methods in Earned Value Management

被引:3
|
作者
Barrientos-Orellana, Alexis [1 ]
Ballesteros-Perez, Pablo [2 ]
Mora-Melia, Daniel [1 ,3 ]
Cerezo-Narvaez, Alberto [4 ]
Gutierrez-Bahamondes, Jimmy H. [5 ]
机构
[1] Univ Talca, Fac Engn, Dept Engn & Construct Management, Camino Niches Km 1, Curico 3340000, Chile
[2] Univ Politecn Valencia, Innovat & Sustainabil Res Ctr PRINS, Project Management, Camino Vera S-N, Valencia 46022, Spain
[3] Univ Politecn Valencia, Dept Hydraul Engn & Environm, Camino Vera S-N, Valencia 46022, Spain
[4] Univ Cadiz, Dept Mech Engn & Ind Design, Avda Univ Cadiz 10, Cadiz 11519, Spain
[5] Univ Talca, Fac Engn, Comp Sci Dept, Camino Niches Km 1, Curico 3340000, Chile
关键词
accuracy; cost prediction methods; earned value analysis; stability; topological structure; DURATION; RISK; PERFORMANCE; COMPLETION; FORECAST; METRICS;
D O I
10.3390/buildings13051206
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Completing a project on time and on budget are essential factors for the success of any project. One technique that allows predicting the final cost of a project is earned value management (EVM). In this technique, different mathematical methods for predicting the final project cost have been proposed over the last 30 years. These formulas make use of activities' actual costs and durations as the project progresses. EVM is a technique widely used by many project management professionals. However, very few studies have compared the stability and accuracy of the multiple existing methods for predicting the final cost of the project (commonly abbreviated as estimated cost at completion, EAC). This study compares the stability and accuracy of 30 deterministic cost prediction methods (EAC) in EVM. For this purpose, a representative database of 4100 simulated projects of various topological structures is used. Our results suggest that the methods with the simplest mathematical configurations achieve better stability and accuracy performance. Knowing which EVM methods are the most stable and accurate for predicting the final cost of the project will help project practitioners choose the most reliable cost prediction techniques when they are managing their own projects in real contexts.
引用
收藏
页数:18
相关论文
共 50 条
  • [41] Schedule-cost Joint Management of Thermal Power Construction Project Based on Improved Earned Value Method
    Wu, Meiqiong
    Wang, Meng
    Niu, Dongxiao
    PROCEEDINGS OF THE 2017 3RD INTERNATIONAL CONFERENCE ON HUMANITIES AND SOCIAL SCIENCE RESEARCH (ICHSSR 2017), 2017, 121 : 35 - 39
  • [42] Consolidate Earned Value Principle with Integrated Cost Management - On Project Budget Control during Construction and Investment Period
    Jia Hu
    Chen Yu Chao
    CALL OF PAPER PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, 2008, : 1181 - 1185
  • [43] Using the Random Tree Classifier to Improve the Project's Cost Predictability in the Earned Value Management: An Empirical Study
    Fernandes, Ana C. da S.
    de Souza, Adler Diniz
    16TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY-NEW GENERATIONS (ITNG 2019), 2019, 800 : 589 - 592
  • [44] Using the Naive Bayes Classifier to Improve the Project's Cost Predictability in the Earned Value Management - An Empirical Study
    Fernandes, A. C. S.
    de Souza, Adler D.
    PROCEEDINGS OF THE 14TH BRAZILIAN SYMPOSIUM ON INFORMATION SYSTEMS (SBSI2018), 2018, : 278 - 284
  • [45] Duration Estimate at Completion: Improving Earned Value Management Forecasting Accuracy
    Solomon Sackey
    Dong-Eun Lee
    Byung-Soo Kim
    KSCE Journal of Civil Engineering, 2020, 24 : 693 - 702
  • [46] Duration Estimate at Completion: Improving Earned Value Management Forecasting Accuracy
    Sackey, Solomon
    Lee, Dong-Eun
    Kim, Byung-Soo
    KSCE JOURNAL OF CIVIL ENGINEERING, 2020, 24 (03) : 693 - 702
  • [47] An extension of the earned value management to improve the accuracy of schedule analysis results
    Najafi, Amir
    Azimi, Fatemeh
    IRANIAN JOURNAL OF MANAGEMENT STUDIES, 2016, 9 (01) : 63 - 75
  • [48] RESEARCH ON THE EARNED VALUE MANAGEMENT SYSTEM APPLIED IN CONSULTANCY PROJECT PERFORMANCE
    Tserng, H. Ping
    Lin, Wen-Shyong
    Li, Chien-Chung
    Weng, Kai-Wei
    Loisel, Denise C.
    JOURNAL OF MARINE SCIENCE AND TECHNOLOGY-TAIWAN, 2015, 23 (01): : 21 - 35
  • [49] "KAIZEN" (Improvement) in Spacecraft Project Management using "Earned Value Analysis"
    Lakshman, Deepti
    Kannan, M. V.
    Bhojraj, H.
    JOURNAL OF SPACECRAFT TECHNOLOGY, 2011, 21 (01): : 21 - 30
  • [50] Using the Earned Value Management System to Improve Electrical Project Control
    Hanna, Awad S.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2012, 138 (03): : 449 - 457