Hydraulic calculation of gravity transportation pipeline system for backfill slurry

被引:0
作者
张钦礼
胡冠宇
王新民
机构
[1] SchoolofResourcesandSafetyEngineering,CentralSouthUniversity,Changsha,China
关键词
hydraulic calculation; critical velocity; working velocity; pipe length-backfill depth ratio; backfill capability;
D O I
暂无
中图分类号
TD52 [井下运输与设备];
学科分类号
0819 ;
摘要
Taking cemented coal gangue pipeline transportation system in Suncun Coal Mine, Xinwen Mining Group, Shandong Province, China, as an example, the hydraulic calculation approaches and process about gravity pipeline transportation of backfill slurry were investigated. The results show that the backfill capability of the backfill system should be higher than 74.4 m3/h according to the mining production and backfill times in the mine; the minimum velocity (critical velocity) and practical working velocity of the backfill slurry are 1.44 and 3.82 m/s, respectively. Various formulae give the maximum ratio of total length to vertical height of pipeline (L/H ratio) of the backfill system of 5.4, and then the reliability and capability of the system can be evaluated.
引用
收藏
页码:645 / 649
页数:5
相关论文
共 7 条
[1]   超稠油管道输送水力及热力计算 [J].
张维志 .
油气储运, 2007, (04) :11-13+62+64
[2]   圆形断面管道非满流流速计算表达式 [J].
茅泽育 ;
赵璇 ;
罗昇 .
水科学进展, 2007, (02) :170-174
[3]   蒸汽管道水力计算软件的开发 [J].
殷爱武 ;
段耀广 ;
孙军 .
山东建筑大学学报, 2007, (01) :61-64
[5]   矿山充填料浆水力坡度计算 [J].
王佩勋 .
有色矿山, 2003, (01) :8-11
[6]  
Quality evaluation of layerlike backfilling and flow pattern of backfill slurry in stope[J] . Xin Peng,Xi-bing Li,Qin-li Zhang,Xin-min Wang.Journal of Central South University of Technology . 2007 (4)
[7]  
Performance of cemented coal gangue backfill[J] . Qin-li Zhang,Xin-min Wang.Journal of Central South University of Technology . 2007 (2)