共 50 条
- [1] Study of enterprises marketing risk early warning system based on BP neural network model J. China Univ. Min. Technol., 2006, 3 (371-375):
- [2] A method for marketing risk early warning based on BP network PROCEEDINGS OF 2005 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1 AND 2, 2005, : 1633 - 1638
- [5] THE WARNING MODEL OF THE EARLY KICK BASED ON BP NEURAL NETWORK PAKISTAN JOURNAL OF STATISTICS, 2014, 30 (06): : 1047 - 1056
- [6] Study of commercial bank loans risk early warning based on BP neural network Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2001, 21 (05):
- [7] THE RESEARCH ON THE EARLY-WARNING SYSTEM MODEL OF OPERATIONAL RISK FOR COMMERCIAL BANKS BASED ON BP NEURAL NETWORK ANALYSIS PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-6, 2009, : 2739 - +
- [8] Study on the Early Warning of PPP Project Risk based on Rough Set and BP Neural Network PROCEEDINGS OF THE 2017 3RD INTERNATIONAL FORUM ON ENERGY, ENVIRONMENT SCIENCE AND MATERIALS (IFEESM 2017), 2017, 120 : 1479 - 1485
- [9] Research on marketing risk early-warning system based on FA-BP evaluation model ADVANCES IN MANAGEMENT OF TECHNOLOGY, PROCEEDINGS, 2007, : 148 - +
- [10] Studying on Fiscal Risk Early-warning Based on BP Neural Network 2ND IEEE INTERNATIONAL CONFERENCE ON ADVANCED COMPUTER CONTROL (ICACC 2010), VOL. 5, 2010, : 481 - 484