共 9 条
[1]
A simplified approach for settlement calculation of pile groups considering pile-to-pile interaction in layered soils[J]. 杨明辉,张小威,赵明华. Journal of Central South University of Technology. 2011(06)
[2]
Settlement monitoring system of pile-group foundation[J]. 陈志坚,张宁宁,张雄文. Journal of Central South University of Technology. 2011(06)
[6]
Settlement calculation for long-short composite piled raft foundation
[J].
JOURNAL OF CENTRAL SOUTH UNIVERSITY OF TECHNOLOGY,
2006, 13 (06)
:749-754
[8]
Study of a complex deep foundation system using 3D finite element analysis .2 TSCHUCHNIGG F,SCHWEIGER H F. Proceedings of the 7th European Conference on Numerical Methods in Geotechnical Engineering . 2010
[9]
Piled raft over soft marine clay:Comparison of in-situ measurement and numerical analyses .2 Binti Azhari,N.A,I.S.H.Harahap. 3rd National Postgraduate Conference-Energy and Sustainability:Exploring the Innovative Minds,NPC 2011 . 2011