Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem

被引:0
|
作者
王宏 [1 ]
李同玲 [1 ]
林丹 [1 ]
机构
[1] School of Sciences,Tianjin University
关键词
project management; resource constrained; scheduling; genetic algorithm;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper presents a new genetic algorithm for the resource-constrained project scheduling problem(RCPSP).The algorithm employs a standardized random key(SRK) vector representation with an additional gene that determines whether the serial or parallel schedule generation scheme(SGS) is to be used as the decoding procedure.The iterative forward-backward improvement as the local search procedure is applied upon all generated solutions to schedule the project three times and obtain an SRK vector,which is reserved into population.Several evolutionary strategies are implemented including the elitist selection(the high quality solution set),and the selection of parents used in crossover operator.The computational experiments on 1 560 standard instances show that the proposed algorithm outperforms the current state-of-the-art heuristic algorithms for J30 and J60,and ranks the third for J120 with 50 000 schedules;it ranks the second for J30 and J60,and ranks the fifth for J120 with 5 000 schedules;it ranks the third,second,and fifth for J30,J60 and J120 with 1 000 schedules,respectively.It is demonstrated that the proposed algorithm is competitive for RCPSP,especially for larger number of schedules.
引用
收藏
页码:376 / 382
页数:7
相关论文
共 50 条
  • [41] Two-Phase Genetic Local Search Algorithm for the Multimode Resource-Constrained Project Scheduling Problem
    Tseng, Lin-Yu
    Chen, Shih-Chieh
    IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2009, 13 (04) : 848 - 857
  • [42] GENETIC ALGORITHMS FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM IN AIRCRAFT HEAVY MAINTENANCE
    Pimapunsri, Kusol
    Weeranant, Darawan
    Riel, Andreas
    SURANAREE JOURNAL OF SCIENCE AND TECHNOLOGY, 2021, 28 (06):
  • [43] A Genetic Algorithm with a New Local Search Method for Solving the Multimode Resource-constrained Project Scheduling Problem
    Afshar, Mohammad Reza
    Shahhosseini, Vahid
    Sebt, Mohammad Hassan
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (03) : 357 - 365
  • [44] Using an enhanced scatter search algorithm for a resource-constrained project scheduling problem
    M. D. Mahdi Mobini
    M. Rabbani
    M. S. Amalnik
    J. Razmi
    A. R. Rahimi-Vahed
    Soft Computing, 2009, 13 : 597 - 610
  • [45] An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem
    Demeulemeester, EL
    Herroelen, WS
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (02) : 334 - 348
  • [46] A hybrid metaheuristic for the resource-constrained project scheduling problem
    Tseng, Lin-Yu
    Chen, Shih-Chieh
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (02) : 707 - 721
  • [47] A hybrid estimation of distribution algorithm for solving the resource-constrained project scheduling problem
    Wang, Ling
    Fang, Chen
    EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (03) : 2451 - 2460
  • [48] Evaluation of Heuristics for a Resource-Constrained Project Scheduling Problem
    Zhong, Shisheng
    Fu, Xuyun
    Lin, Lin
    Wang, Guolei
    MACHINING AND ADVANCED MANUFACTURING TECHNOLOGY X, 2010, 431-432 : 122 - 125
  • [49] Hybrid genetic algorithm with adaptive abilities for resource-constrained multiple project scheduling
    Dai, T
    Kim, K
    Yokota, T
    Gen, M
    Proceedings of the Second International Conference on Information and Management Sciences, 2002, 2 : 440 - 440
  • [50] Quantum-Inspired Genetic Algorithm for Resource-Constrained Project-Scheduling
    Saad, Hatem M. H.
    Chakrabortty, Ripon K.
    Elsayed, Saber
    Ryan, Michael J.
    IEEE ACCESS, 2021, 9 : 38488 - 38502