Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem

被引:0
|
作者
王宏 [1 ]
李同玲 [1 ]
林丹 [1 ]
机构
[1] School of Sciences,Tianjin University
关键词
project management; resource constrained; scheduling; genetic algorithm;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper presents a new genetic algorithm for the resource-constrained project scheduling problem(RCPSP).The algorithm employs a standardized random key(SRK) vector representation with an additional gene that determines whether the serial or parallel schedule generation scheme(SGS) is to be used as the decoding procedure.The iterative forward-backward improvement as the local search procedure is applied upon all generated solutions to schedule the project three times and obtain an SRK vector,which is reserved into population.Several evolutionary strategies are implemented including the elitist selection(the high quality solution set),and the selection of parents used in crossover operator.The computational experiments on 1 560 standard instances show that the proposed algorithm outperforms the current state-of-the-art heuristic algorithms for J30 and J60,and ranks the third for J120 with 50 000 schedules;it ranks the second for J30 and J60,and ranks the fifth for J120 with 5 000 schedules;it ranks the third,second,and fifth for J30,J60 and J120 with 1 000 schedules,respectively.It is demonstrated that the proposed algorithm is competitive for RCPSP,especially for larger number of schedules.
引用
收藏
页码:376 / 382
页数:7
相关论文
共 50 条
  • [31] Hybrid multimode resource-constrained maintenance project scheduling problem
    Kosztyan, Zsolt T.
    Pribojszki-Nemeth, Aniko
    Szalkai, Istvan
    OPERATIONS RESEARCH PERSPECTIVES, 2019, 6
  • [32] Resource-constrained multi-project scheduling problem: A survey
    Gomez Sanchez, Mariam
    Lalla-Ruiz, Eduardo
    Gil, Alejandro Fernandez
    Castro, Carlos
    Voss, Stefan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 309 (03) : 958 - 976
  • [33] Solving resource-constrained project scheduling problem with evolutionary programming
    Sebt, M. H.
    Alipouri, Y.
    Alipouri, Y.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2013, 64 (09) : 1327 - 1335
  • [34] The Resource-constrained Project Scheduling Problem with Stochastic Activity Durations
    Creemers, S.
    2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 453 - 457
  • [35] A Tool for Comparing Resource-Constrained Project Scheduling Problem Algorithms
    Olteanu, Alexandru-Liviu
    AIC '09: PROCEEDINGS OF THE 9TH WSEAS INTERNATIONAL CONFERENCE ON APPLIED INFORMATICS AND COMMUNICATIONS: RECENT ADVANCES IN APPLIED INFORMAT AND COMMUNICATIONS, 2009, : 182 - +
  • [36] Multidirectional Scheduling Scheme in Resource-Constrained Project Scheduling Problem
    Yoosefzadeh, Hamid R.
    Tareghian, Hamed R.
    Farahi, Mohammad H.
    NAVAL RESEARCH LOGISTICS, 2014, 61 (01) : 44 - 55
  • [37] An evolutionary implicit enumeration procedure for solving the resource-constrained project scheduling problem
    Zamani, Reza
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2017, 24 (06) : 1525 - 1547
  • [38] A genetic algorithm for the Resource-Constrained Project Scheduling Problem with Alternative Subgraphs using a boolean satisfiability solver
    Servranckx, Tom
    Coelho, Jose
    Vanhoucke, Mario
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 316 (03) : 815 - 827
  • [39] A Multiagent Evolutionary Algorithm for the Resource-Constrained Project Portfolio Selection and Scheduling Problem
    Shou, Yongyi
    Xiang, Wenwen
    Li, Ying
    Yao, Weijian
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [40] A discrete artificial bee colony algorithm for resource-constrained project scheduling problem
    Nouri, Nouha
    Krichen, Saoussen
    Ladhari, Tale
    2013 5TH INTERNATIONAL CONFERENCE ON MODELING, SIMULATION AND APPLIED OPTIMIZATION (ICMSAO), 2013,