Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem

被引:0
|
作者
王宏 [1 ]
李同玲 [1 ]
林丹 [1 ]
机构
[1] School of Sciences,Tianjin University
关键词
project management; resource constrained; scheduling; genetic algorithm;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper presents a new genetic algorithm for the resource-constrained project scheduling problem(RCPSP).The algorithm employs a standardized random key(SRK) vector representation with an additional gene that determines whether the serial or parallel schedule generation scheme(SGS) is to be used as the decoding procedure.The iterative forward-backward improvement as the local search procedure is applied upon all generated solutions to schedule the project three times and obtain an SRK vector,which is reserved into population.Several evolutionary strategies are implemented including the elitist selection(the high quality solution set),and the selection of parents used in crossover operator.The computational experiments on 1 560 standard instances show that the proposed algorithm outperforms the current state-of-the-art heuristic algorithms for J30 and J60,and ranks the third for J120 with 50 000 schedules;it ranks the second for J30 and J60,and ranks the fifth for J120 with 5 000 schedules;it ranks the third,second,and fifth for J30,J60 and J120 with 1 000 schedules,respectively.It is demonstrated that the proposed algorithm is competitive for RCPSP,especially for larger number of schedules.
引用
收藏
页码:376 / 382
页数:7
相关论文
共 50 条
  • [1] Efficient genetic algorithm for resource-constrained project scheduling problem
    Wang H.
    Li T.
    Lin D.
    Transactions of Tianjin University, 2010, 16 (5) : 376 - 382
  • [2] A new genetic algorithm for resource-constrained project scheduling problem
    Luo Ronggui
    Chen Xiaoming
    Huang Minmei
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS 1 AND 2, 2006, : 1595 - 1599
  • [3] A hybrid genetic algorithm for the resource-constrained project scheduling problem
    Valls, Vicente
    Ballestin, Francisco
    Quintanilla, Sacramento
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 185 (02) : 495 - 508
  • [4] An efficient hybrid algorithm for resource-constrained project scheduling
    Chen, Wang
    Shi, Yan-jun
    Teng, Hong-fei
    Lan, Xiao-ping
    Hu, Li-chen
    INFORMATION SCIENCES, 2010, 180 (06) : 1031 - 1039
  • [5] A competitive Genetic Algorithm for resource-constrained project scheduling problem
    Wang, H
    Lin, D
    Li, MQ
    Proceedings of 2005 International Conference on Machine Learning and Cybernetics, Vols 1-9, 2005, : 2945 - 2949
  • [6] Solving Resource-Constrained Project Scheduling Problem by Genetic Algorithm
    Kadam, Sachin U.
    Kadam, Narendra S.
    2014 2ND INTERNATIONAL CONFERENCE ON BUSINESS AND INFORMATION MANAGEMENT (ICBIM), 2014,
  • [7] Memetic algorithm for the resource-constrained project scheduling problem
    Chen, Di
    Liu, Shixin
    Qin, Shujin
    2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 4991 - 4996
  • [8] A Genetic Algorithm with Neighborhood Search for the Resource-Constrained Project Scheduling Problem
    Proon, Sepehr
    Jin, Mingzhou
    NAVAL RESEARCH LOGISTICS, 2011, 58 (02) : 73 - 82
  • [9] Genetic Algorithm Parameters Tuning for Resource-constrained Project Scheduling Problem
    Tian, Xingke
    Yuan, Shengrui
    ADVANCES IN MATERIALS, MACHINERY, ELECTRONICS II, 2018, 1955
  • [10] Solving Resource-Constrained Project Scheduling Problem via Genetic Algorithm
    Liu, Jia
    Liu, Yisheng
    Shi, Ying
    Li, Jian
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2020, 34 (02)