Application-adaptive resource scheduling in a computational grid

被引:2
|
作者
LUAN Cui-ju1
机构
基金
中国国家自然科学基金;
关键词
Grid; Resource scheduling; Heuristic knowledge; Greedy scheduling algorithm;
D O I
暂无
中图分类号
TP393.01 [];
学科分类号
摘要
Selecting appropriate resources for running a job efficiently is one of the common objectives in a computational grid. Resource scheduling should consider the specific characteristics of the application, and decide the metrics to be used accordingly. This paper presents a distributed resource scheduling framework mainly consisting of a job scheduler and a local scheduler. In order to meet the requirements of different applications, we adopt HGSA, a Heuristic-based Greedy Scheduling Algorithm, to schedule jobs in the grid, where the heuristic knowledge is the metric weights of the computing resources and the metric workload impact factors. The metric weight is used to control the effect of the metric on the application. For different applications, only metric weights and the metric workload impact factors need to be changed, while the scheduling algorithm remains the same. Experimental results are presented to demonstrate the adaptability of the HGSA.
引用
收藏
页码:1634 / 1641
页数:8
相关论文
共 50 条
  • [1] Application-adaptive resource scheduling in a computational grid
    Luan C.-J.
    Song G.-H.
    Zheng Y.
    J Zhejiang Univ: Sci, 2006, 10 (1634-1641): : 1634 - 1641
  • [2] An adaptive resource scheduling algorithm for computational grid
    Wang, Tao
    Zhou, Xing-she
    Liu, Qiu-rang
    Yang, Zhi-yi
    Wang, Yun-lan
    APSCC: 2006 IEEE ASIA-PACIFIC CONFERENCE ON SERVICES COMPUTING, PROCEEDINGS, 2006, : 447 - +
  • [3] Overlay wireless sensor networks for application-adaptive scheduling in WLAN
    Waharte, S
    Xiao, J
    Boutaba, R
    HIGH SPEED NETWORKS AND MULTIMEDIA COMMUNICATIONS, PROCEEDINGS, 2004, 3079 : 676 - 684
  • [4] Adaptive scheduling and resource assessment in GRID
    Krasnotcshekov, V.
    Vakhitov, A.
    PARALLEL COMPUTING TECHNOLOGIES, PROCEEDINGS, 2007, 4671 : 240 - 244
  • [5] An Adaptive Scheduling Algorithm for Scheduling Tasks in Computational Grid
    Yu, Kun-Ming
    Chen, Cheng-Kwan
    GCC 2008: SEVENTH INTERNATIONAL CONFERENCE ON GRID AND COOPERATIVE COMPUTING, PROCEEDINGS, 2008, : 185 - 189
  • [6] QoS based resource scheduling by computational economy in computational grid
    Li, CL
    Li, LY
    INFORMATION PROCESSING LETTERS, 2006, 98 (03) : 119 - 126
  • [7] Adaptive task scheduling in computational GRID environments
    Hidalgo-Conde, M
    Rodríguez, A
    Ramírez, S
    Trelles, O
    ADVANCES IN GRID COMPUTING - EGC 2005, 2005, 3470 : 880 - 890
  • [8] Adaptive Control in Grid Computing Resource Scheduling
    Yuan, Jia-bin
    Luo, Jiao-min
    Duan, Bo-jia
    HIGH PERFORMANCE COMPUTING AND APPLICATIONS, 2010, 5938 : 528 - 533
  • [9] Resource discovery and economic scheduling policy in computational grid
    School of Computer Science and Technology, Wuhan University of Technology, Wuhan 430063, China
    Wuhan Ligong Daxue Xuebao (Jiaotong Kexue Yu Gongcheng Ban), 2006, 5 (763-766):
  • [10] OD: A general resource scheduling algorithm for computational Grid
    Wang, Tao
    Zhou, Xingshe
    Liu, Qiurang
    Yang, Zhiyi
    Yang, Zhaoqing
    FIRST INTERNATIONAL MULTI-SYMPOSIUMS ON COMPUTER AND COMPUTATIONAL SCIENCES (IMSCCS 2006), PROCEEDINGS, VOL 1, 2006, : 644 - +