High Level Radioactive Waste Disposal in China

被引:0
作者
Ju Wang Beijing Research Institute of Uranium Geology
机构
关键词
HLW disposal; R&D program; Site selection; bentonite;
D O I
暂无
中图分类号
TL942 [放射性废物的处置];
学科分类号
082704 ;
摘要
The Chinese government has decided that the installed capacity of nuclear power plants(NPP)will reach 40 GW by the year of 2020,while other 18 GW under construction,and the electricity produced by NPPs will make up 4%of the whole installed capacity. In such case,the spent fuel generated from those NPPs will reach 82630 tons by 2050.The Chinese policy is that,the spent fuel from light water reactors will be reprocessed first,followed by verification and final