共 2 条
[1]
A multi-step approach for block-cave production scheduling optimization[J]. Yashar Pourrahimian,Hooman Askari-Nasab,Dwayne D.Tannant. International Journal of Mining Science and Technology. 2013(05)
[2]
Dynamic optimization of cutoff grade in underground metal mining[J]. 顾晓薇,王青,初道忠,张斌. Journal of Central South University of Technology. 2010(03)