TBM Construction Process Simulation and Performance Optimization

被引:0
作者
刘东海
周云晴
焦凯
机构
[1] SchoolofCivilEngineering,TianjinUniversity
关键词
tunnel boring machine (TBM); construction simulation; schedule; efficiency analysis; optimization;
D O I
暂无
中图分类号
U455.43 [盾构法(全断面开挖)];
学科分类号
0814 ; 081406 ;
摘要
Long tunnel excavation with tunnel boring machine (TBM) is a complex and stochastic process. It is easily affected by uncertainties and needs to be adjusted according to specific geological conditions in different tunnel sections, which makes the construction scheduling and management difficult. Based on the rock mass classification, this paper estimates the penetration rate. Using the rate, a cyclic network simulation (CYCLONE) model of TBM boring system is established, and the advance rates under different geological conditions are determined. Then, the impact of different cutter head thrust, which is chosen in reasonable range according to previous experiences, on project schedule is analyzed. Moreover, the simulation model of mucking system is built to determine the number of muck trains and rail intersections reasonably, regarding the efficiency of muck loading and material transporting. Based on the interaction and interrelation between TBM boring system and mucking system, the combined CYCLONE model for the entire tunneling process is established. Then reasonable construction schedule, the utilization rate of working resources, and the probability of project completion are obtained through the model programming. At last, a project application shows the feasibility of the presented method.
引用
收藏
页码:194 / 202
页数:9
相关论文
共 6 条
[1]   Experimental and numerical studies on rock breaking with TBM tools under high stress confinement [J].
Innaurato, N. ;
Oggeri, C. ;
Oreste, P. P. ;
Vinai, R. .
ROCK MECHANICS AND ROCK ENGINEERING, 2007, 40 (05) :429-451
[2]   TBM performance estimation using rock mass classifications [J].
Sapigni, M ;
Berti, M ;
Bethaz, E ;
Busillo, A ;
Cardone, G .
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2002, 39 (06) :771-788
[3]   GEOLOGIC PREDICTION MODEL FOR TUNNELING [J].
IOANNOU, PG .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1987, 113 (04) :569-590
[4]  
Improved strategies for TBM performance prediction and project management. Nelson P P,Yousof A A,Laughton C. RETC Proceeding . 1999
[5]  
Hard Rock Tunnel Boring. Bruland A. Norwegian University of Science and Technology . 1998
[6]  
TBM performance in rock using QTBM. N. Barton. Tunnel and Tunnelling . 1999