共 50 条
- [1] The Fluvial Process of Wandering Reach in the Lower Yellow River CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1309 - 1313
- [2] Numerical simulation of fluvial process in the Lower Yellow River with 'secondary perched river' Shuili Fadian Xuebao, 2008, 6 (136-141):
- [3] The characteristics of fluvial process of the Yellow River lower reach after 1986 RIVER SEDIMENTATION: THEORY AND APPLICATIONS, 1999, : 819 - 823
- [4] Impact of sediment retention by reservoirs on the fluvial process in the Lower Yellow River Shuikexue Jinzhan/Advances in Water Science, 2024, 35 (03): : 475 - 484
- [5] On Sediment Reduction by Dredging at Estuary in Lower Yellow River PROCEEDINGS OF THE 3RD INTERNATIONAL YELLOW RIVER FORUM ON SUSTAINABLE WATER RESOURCES MANAGEMENT AND DELTA ECOSYSTEM MAINTENANCE, VOL IV, 2007, : 126 - 131
- [6] Consideration on Dredging in Narrow Reach of Lower Yellow River PROCEEDINGS OF THE 2ND INTERNATIONAL YELLOW RIVER FORUM ON KEEPING HEALTHY LIFE OF THE RIVER, VOL IV, 2005, : 52 - 57
- [7] Experimental study on dredging efficiency in the Lower Yellow River PROCEEDINGS OF THE NINTH INTERNATIONAL SYMPOSIUM ON RIVER SEDIMENTATION, VOLS 1-4, 2004, : 1678 - 1684
- [9] Fluvial processes of the downstream reaches of the reservoirs in the Lower Yellow River Journal of Geographical Sciences, 2016, 26 : 1321 - 1336