RCC Arch Dam Structure on the Taxi River and Water Storage Measure During Construction

被引:0
|
作者
刘光廷
李鹏辉
胡昱
张富德
谢树南
机构
关键词
roller compacted concrete (RCC) arch dam; artificial short joint; concrete plug;
D O I
暂无
中图分类号
TV64 [挡水坝];
学科分类号
081504 ;
摘要
The new structure of roller compacted concrete (RCC) arch dams is presented for extremely cold and earthquake prone areas. The influence of construction plans and improved materials on the stresses in the Taxi River dam is also given. Earlier impoundment of water is shown to not only benefit the engineering design but also improve the stresses during construction in winter. Low cement content in the concrete and artificial short joints improved the monolithic structure and the transmitted forces. The concrete plug installed in the first cooled part of the arch dam provides excellent force transmission in the arch, which increases the monolith of the earlier arch, reduces the increasing thermal stresses that occur later, and improves the deformation flexibility of the dam.
引用
收藏
页码:243 / 250 +269
页数:9
相关论文
共 50 条
  • [1] The RCC Arch Dam Analysis During Overload
    Xia, Yu
    Yu, Ying-ye
    Zhao, Xiao-lian
    Zhang, Zhong-qing
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 2088 - +
  • [2] Study on influence of construction and water storage process on valley deformation of high arch dam
    Yang, Xiang
    Ren, Xuhua
    Ren, Qingwen
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2022, 81 (07)
  • [3] Study on influence of construction and water storage process on valley deformation of high arch dam
    Xiang Yang
    Xuhua Ren
    Qingwen Ren
    Bulletin of Engineering Geology and the Environment, 2022, 81
  • [4] Simulation of temperature and stress fields during RCC dam construction
    Luna, Ronaldo
    Wu, Yong
    Journal of Construction Engineering and Management, 2000, 126 (05) : 381 - 388
  • [5] Simulation of temperature and stress fields during RCC dam construction
    Luna, R
    Wu, Y
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (05): : 381 - 388
  • [6] Simplified numerical method in stress analysis of RCC arch dam with layered structure
    Liu, Guangting
    Hao, Jutao
    Qinghua Daxue Xuebao/Journal of Tsinghua University, 1996, 36 (01): : 27 - 33
  • [8] Intensified monitoring of Emosson arch dam during construction of Nant de Drance pump storage scheme
    Stahl, H.
    DAMS AND RESERVOIRS UNDER CHANGING CHALLENGES, 2011, : 73 - 78
  • [9] Thermal deformation coordination analysis of CC-RCC combined dam structure during construction and operation periods
    Li, Mingchao
    Si, Wen
    Du, Shengli
    Zhang, Mengxi
    Ren, Qiubing
    Shen, Yang
    ENGINEERING STRUCTURES, 2020, 213
  • [10] Multipoint hybrid model for RCC arch dam displacement health monitoring considering construction interface and its seepage
    Liu, Bo
    Wei, Bowen
    Li, Huokun
    Mao, Ying
    APPLIED MATHEMATICAL MODELLING, 2022, 110 : 674 - 696