Dynamic failure risk of coal pillar formed by irregular shape longwall face:A case study

被引:1
作者
Yixin Zhao [1 ]
Hao Wang [1 ]
Shimin Liu [2 ]
Zonglong Mu [3 ]
Zhiguo Lu [1 ]
机构
[1] Beijing Key Laboratory for Precise Mining of Intergrown Energy and Resources, School of Resources and Safety Engineering, China University of Mining & Technology
[2] Department of Energy and Mineral Engineering, G Center and EMS Energy Institute, Pennsylvania State University, University Park
[3] School of Mines, China University of Mining & Technology
关键词
Coal bump; Coal pillar; Tremor; Irregular shape longwall face; Static and dynamic stress overlapping;
D O I
暂无
中图分类号
TD311 [原岩应力];
学科分类号
0819 ;
摘要
Irregular shape workface would result in the presence of coal pillar, which leads to high stress concentration and possibly induces coal bumps. In order to study the coal bump mechanism of pillars, static and dynamic stress overlapping(SDSO) method was proposed to explain the impacts of static stress concentration and tremors induced by mining activities. The stress and deformation in surrounding rock of mining face were analyzed based on the field case study at 1303 workface in Zhaolou Coal Mine in China.The results illustrate that the surrounding rock of a workface could be divided into four different zones,i.e., residual stress zone, stress decrease zone, stress increase zone and original stress zone. The stress increase zone is prone to failure under the SDSO impact loading conditions and will provide elastic energy for inducing coal bump. Based on the numerical modelling results, the evolution of static stress in coal pillar as the size of gob increasing was studied, and the impact of dynamic stress was investigated through analyzing the characteristics of tremor activities. The numerical results demonstrate the peak value of vertical stress in coal pillar rises from about 30 MPa with mining distance 10 m to 52.6 MPa with mining distance 120 m, and the location of peak stress transfers to the inner zone of coal pillars as the workface moves forward. For the daily tremor activities, tremors with high energy released indicate high dynamic stress disturbance on the surrounding rock, therefore, the impact of dynamic stressing is more serious during workface extension period because the tremor frequency and average energy after workface extension are higher than those before the workface extension.
引用
收藏
页码:775 / 781
页数:7
相关论文
共 21 条
[1]   深埋复杂不规则孤岛工作面冲击矿压机制研究 [J].
朱广安 ;
窦林名 ;
刘阳 ;
苏振国 ;
李慧 .
采矿与安全工程学报, 2016, 33 (04) :630-635
[2]   上下盘开采顺序对断层煤柱采动应力的影响 [J].
代进 ;
蒋金泉 .
采矿与安全工程学报, 2016, 33 (01) :35-41
[3]   我国煤矿冲击地压的研究现状:机制、预警与控制 [J].
姜耀东 ;
赵毅鑫 .
岩石力学与工程学报, 2015, 34 (11) :2188-2204
[4]   两侧不规则采空区孤岛工作面煤体整体冲击失稳研究 [J].
姜福兴 ;
成功 ;
冯宇 ;
王存文 ;
徐勇勇 .
岩石力学与工程学报, 2015, 34(S2) (S2) :4164-4170
[5]   特厚煤层下山煤柱区巷道冲击危险性实时监测预警研究 [J].
魏全德 ;
姜福兴 ;
姚顺利 ;
魏向志 ;
舒凑先 ;
郝其林 .
采矿与安全工程学报, 2015, 32 (04) :530-536
[6]   薄煤层动静组合诱发冲击地压的机制 [J].
何江 ;
窦林名 ;
蔡武 ;
李振雷 ;
丁言露 .
煤炭学报, 2014, 39 (11) :2177-2182
[7]   工作面动压影响下老窑破坏区煤柱应力状态研究 [J].
王宏伟 ;
姜耀东 ;
邓保平 ;
詹绍建 .
岩石力学与工程学报, 2014, 33 (10) :2056-2063
[8]   坚硬顶板孤岛煤柱工作面冲击特征及机制分析 [J].
李振雷 ;
窦林名 ;
王桂峰 ;
蔡武 ;
何江 ;
丁言露 .
采矿与安全工程学报, 2014, 31 (04) :519-524
[9]   我国煤炭开采中的冲击地压机理和防治 [J].
姜耀东 ;
潘一山 ;
姜福兴 ;
窦林名 ;
鞠杨 .
煤炭学报, 2014, 39 (02) :205-213
[10]   岩-煤-岩组合体破坏特征及冲击倾向性试验研究 [J].
牟宗龙 ;
王浩 ;
彭蓬 ;
刘振江 ;
杨晓晨 .
采矿与安全工程学报, 2013, 30 (06) :841-847