一种新颖的解决包含模式切换过渡过程的炼油厂生产调度问题的两阶段拉格朗日分解算法(英文)

被引:4
作者
施磊 [1 ]
江永亨 [1 ]
王凌 [1 ,2 ]
黄德先 [1 ,2 ]
机构
[1] Institute of Process Control Engineering,Department of Automation,Tsinghua University
[2] Tsinghua National Laboratory for Information Science and Technology,Tsinghua
关键词
Refinery scheduling; Operational transitions; Lagrangian decomposition;
D O I
暂无
中图分类号
TP301.6 [算法理论]; TE68 [油气加工厂];
学科分类号
摘要
To address large scale industrial processes,a novel Lagrangian scheme is proposed to decompose a refinery scheduling problem with operational transitions in mode switching into a production subproblem and a blending and delivery subproblem.To accelerate the convergence of Lagrange multipliers,some auxiliary constraints are added in the blending and delivery subproblem.A speed-up scheme is presented to increase the efficiency for solving the production subproblem.An initialization scheme of Lagrange multipliers and a heuristic algorithm to find feasible solutions are designed.Computational results on three cases with different lengths of time horizons and different numbers of orders show that the proposed Lagrangian scheme is effective and efficient.
引用
收藏
页码:1793 / 1800
页数:8
相关论文
共 12 条
  • [1] 高纯度精馏过程的集成控制与在线优化策略(英文)
    吕文祥
    朱鹰
    黄德先
    江永亨
    金以慧
    [J]. Chinese Journal of Chemical Engineering, 2010, 18 (01) : 66 - 79
  • [2] Lagrangian relaxation based decomposition for well scheduling in shale-gas systems[J] . Brage Rugstad Knudsen,Ignacio E. Grossmann,Bjarne Foss,Andrew R. Conn.Computers and Chemical Engineering . 2014
  • [3] Optimal supply chain design and management over a multi-period horizon under demand uncertainty. Part II: A Lagrangean decomposition algorithm[J] . Jiang Yongheng,Maria Analia Rodriguez,Iiro Harjunkoski,Ignacio E. Grossmann.Computers and Chemical Engineering . 2013
  • [4] A new Lagrangian decomposition approach applied to the integration of refinery planning and crude-oil scheduling
    Mouret, Sylvain
    Grossmann, Ignacio E.
    Pestiaux, Pierre
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2011, 35 (12) : 2750 - 2766
  • [5] Temporal and spatial Lagrangean decompositions in multi-site, multi-period production planning problems with sequence-dependent changeovers[J] . Sebastian Terrazas-Moreno,Philipp A. Trotter,Ignacio E. Grossmann.Computers and Chemical Engineering . 2011 (12)
  • [6] Production planning and scheduling integration through augmented Lagrangian optimization[J] . Zukui Li,Marianthi G. Ierapetritou.Computers and Chemical Engineering . 2009 (6)
  • [7] Efficient short-term scheduling of refinery operations based on a continuous time formulation[J] . Zhenya Jia,Marianthi Ierapetritou.Computers and Chemical Engineering . 2003 (6)
  • [8] An improved stepsize of the subgradient algorithm for solving the lagrangian relaxation problem[J] . Shih-Ho Wang.Computers and Electrical Engineering . 2002 (1)
  • [9] Steel-making process scheduling using Lagrangian relaxation
    Tang, LX
    Luh, PB
    Liu, JY
    Fang, L
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (01) : 55 - 70
  • [10] Planning and scheduling models for refinery operations[J] . J.M. Pinto,M. Joly,L.F.L. Moro.Computers and Chemical Engineering . 2000 (9)