共 50 条
[43]
Safety Analysis of the Temporary Dam Body of Concrete Faced Rockfill Dam during Construction Period
[J].
ADVANCES IN CIVIL ENGINEERING, PTS 1-6,
2011, 255-260
:3676-3681
[44]
Seepage behavior and its control performance assessment for a high concrete faced rockfill dam in karst areas
[J].
Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering,
2024, 43 (02)
:481-494