Joint optimization of maintenance inspection and spare provisioning for aircraft deteriorating parts

被引:0
作者
Jing Cai [1 ]
Xin Li [1 ]
Xi Chen [2 ]
机构
[1] College of Civil Aviation, Nanjing University of Aeronautics and Astronautics
[2] Shanghai Aircraft Customer Service Co., Ltd.
基金
中央高校基本科研业务费专项资金资助;
关键词
joint optimization; maintenance; spare provision; aircraft part; Wiener process;
D O I
暂无
中图分类号
V267 [航空器的维护与修理];
学科分类号
082503 ;
摘要
With the wide application of condition based maintenance(CBM) in aircraft maintenance practice, the joint optimization of maintenance and inventory management, which can take full advantage of CBM and reduce the aircraft operational cost, is receiving increasing attention. In order to optimize the inspection interval, maintenance decision and spare provisioning together for aircraft deteriorating parts, firstly, a joint inventory management strategy is presented, then, a joint optimization of maintenance inspection and spare provisioning for aircraft parts subject to the Wiener degradation process is proposed based on the strategy.Secondly, a combination of the genetic algorithm(GA) and the Monte Carol method is developed to minimize the total cost rate.Finally, a case study is conducted and the proposed joint optimization model is compared with the existing optimization model and the airline real case. The results demonstrate that the proposed model is more beneficial and effective. In addition, the sensitivity analysis of the proposed model shows that the lead time has higher influence on the optimal results than the urgent order cost and the corrective maintenance cost, which is consistent with the actual situation of aircraft maintenance practices and inventory management.
引用
收藏
页码:1133 / 1140
页数:8
相关论文
共 50 条
  • [31] Joint Optimization of Replacement and Spare Parts Ordering with Dual Sourcing
    Ye H.
    Su H.
    Zheng M.
    Xia T.
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2022, 56 (10): : 1359 - 1367
  • [32] Joint condition-based maintenance and spare provisioning policy for a K -out-of- N system with failures during inspection intervals
    Zheng, Meimei
    Lin, Jie
    Xia, Tangbin
    Liu, Yu
    Pan, Ershun
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 308 (03) : 1220 - 1232
  • [33] JOINT OPTIMIZATION OF STATE MAINTENANCE AND SPARE PARTS INVENTORY OF OFFSHORE WIND TURBINES BASED ON DEEP REINFORCEMENT LEARNING
    Dong W.
    Wu Y.
    Yao Q.
    Guo J.
    Zhao T.
    Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2023, 44 (12): : 190 - 199
  • [34] Spare parts supply with incoming quality control and inspection errors in condition based maintenance
    Al Hanbali, Ahmad
    Saleh, Haitham H.
    Alsawafy, Omar G.
    Attia, Ahmed M.
    Ghaithan, Ahmed M.
    Mohammed, Awsan
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 172
  • [35] (s,Q) spare parts provisioning strategy for periodically replaced systems
    Diallo, Claver
    Ait-Kadi, Daoud
    Chelbi, Anis
    IEEE TRANSACTIONS ON RELIABILITY, 2008, 57 (01) : 134 - 139
  • [36] An Optimal Policy for Maintenance, Intermediate Buffer, and Spare Parts
    Gan, Shuyuan
    Zhang, Zhisheng
    Zhou, Yifan
    PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON QUALITY, RELIABILITY, RISK, MAINTENANCE, AND SAFETY ENGINEERING (QR2MSE), VOLS I-IV, 2013, : 643 - 648
  • [37] Spare parts demand: Linking forecasting to equipment maintenance
    Wang, Wenbin
    Syntetos, Aris A.
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2011, 47 (06) : 1194 - 1209
  • [38] Joint optimization of job scheduling, condition-based maintenance planning, and spare parts ordering for degrading production systems
    Zhang, Wenyu
    He, Shuguang
    Zhang, Xiaohong
    Zhao, Xing
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2024, 252
  • [39] Research on Joint Optimization of Level of Repair Analysis and Spare Parts Stocks
    Xu, Li
    Li, Qingmin
    Li, Hua
    MECHANICAL COMPONENTS AND CONTROL ENGINEERING III, 2014, 668-669 : 1633 - +
  • [40] Joint Optimization of Condition-Based Maintenance and Spare Parts Orders for Multi-Unit Systems with Dual Sourcing
    Zheng, Meimei
    Ye, Hongqing
    Wang, Dong
    Pan, Ershun
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2021, 210