Wear Analysis of Disc Cutters of Full Face Rock Tunnel Boring Machine

被引:0
|
作者
ZHANG Zhaohuang [1 ]
MENG Liang [2 ]
SUN Fei [2 ]
机构
[1] School of Energy, Power and Mechanical Engineering, North China Electric Power University
[2] Foreign Languages School, North China Electric Power University
基金
中国国家自然科学基金;
关键词
full face rock tunnel boring machine; disc cutter; radial wear coefficient; axial wear coefficient; trajectory wear coefficient;
D O I
暂无
中图分类号
TD421.5 [];
学科分类号
0819 ;
摘要
Wear is a major factor of disc cutters’ failure. No current theory offers a standard for the prediction of disc cutter wear yet. In the field the wear prediction method commonly used is based on the excavation length of tunnel boring machine(TBM) to predict the disc cutter wear and its wear law, considering the location number of each disc cutter on the cutterhead(radius for installation); in theory, there is a prediction method of using arc wear coefficient. However, the preceding two methods have their own errors, with their accuracy being 40% or so and largely relying on the technicians’ experience. Therefore, radial wear coefficient, axial wear coefficient and trajectory wear coefficient are defined on the basis of the operating characteristics of TBM. With reference to the installation and characteristics of disc cutters, those coefficients are modified according to penetration, which gives rise to the presentation of comprehensive axial wear coefficient, comprehensive radial wear coefficient and comprehensive trajectory wear coefficient. Calculation and determination of wear coefficients are made with consideration of data from a segment of TBM project(excavation length 173 m). The resulting wear coefficient values, after modification, are adopted to predict the disc cutter wear in the follow-up segment of the TBM project(excavation length of 5621 m). The prediction results show that the disc cutter wear predicted with comprehensive radial wear coefficient and comprehensive trajectory wear coefficient are not only accurate(accuracy 16.12%) but also highly congruous, whereas there is a larger deviation in the prediction with comprehensive axial wear coefficient(accuracy 41%, which is in agreement with the prediction of disc cutters’ life in the field). This paper puts forth a new method concerning prediction of life span and wear of TBM disc cutters as well as timing for replacing disc cutters.
引用
收藏
页码:1294 / 1300
页数:7
相关论文
共 50 条
  • [41] Prediction of the number of consumed disc cutters of tunnel boring machine using intelligent methods
    Afradi, Alireza
    Ebrahimabadi, Arash
    Hallajian, Tahereh
    MINING OF MINERAL DEPOSITS, 2021, 15 (04): : 68 - 74
  • [42] Cutters' layout method of tunnel boring machine cutter-head under mixed-face rock ground
    Liu J.-Q.
    Xing Z.-H.
    Bin H.-C.
    Guo W.
    Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2019, 53 (01): : 166 - 173
  • [43] Enhanced wear prediction of tunnel boring machine disc cutters for accurate remaining useful life estimation using a hybrid model
    Zhou, Xinghai
    Zhang, Yakun
    Gong, Guofang
    Yang, Huayong
    Chen, Qiaosong
    Chen, Yuxi
    Su, Zhixue
    FRONTIERS OF STRUCTURAL AND CIVIL ENGINEERING, 2024, 18 (04) : 642 - 662
  • [44] WInBot: A Disc Cutter Wear Inspection Robot for a Tunnel Boring Machine
    Yamada, Yudai
    Fukui, Rui
    Warisawa, Shin'ichi
    Morioka, Eiichi
    Uetake, Masaaki
    Terada, Shin'ichi
    2019 IEEE 15TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2019, : 1837 - 1843
  • [45] Numerical Simulation of Rock Breaking by Disc Cutter of Tunnel Boring Machine
    Wu, Qixing
    An, Guanfeng
    Zhou, Xiaowen
    Chen, Lin
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING III, PT 1, 2014, 638-640 : 888 - +
  • [46] ROCK CUTTING TOOLS - THEIR ARRANGEMENT ON FULL FACE TUNNEL BORING MACHINES
    ORIELLY, MP
    HIGNETT, HJ
    CME-CHARTERED MECHANICAL ENGINEER, 1977, 24 (03): : 47 - 51
  • [47] Dynamic Simulation and Thermal Analysis of Rock Breaking Force on Disc Cutter of Tunnel Boring Machine
    An, Yuan
    Li, Maosen
    Chen, Siyuan
    Hu, Yong
    Zhang, Aiwu
    Zhai, You
    2019 4TH INTERNATIONAL CONFERENCE ON MECHANICAL, CONTROL AND COMPUTER ENGINEERING (ICMCCE 2019), 2019, : 1015 - 1020
  • [48] Transfer component analysis-driven domain adaptation approach for estimating the life of tunnel boring machine disc cutters
    Loy-Benitez, Jorge
    Lee, Hyun-Koo
    Song, Myung Kyu
    Choi, Yohyun
    Lee, Sean Seungwon
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2024, 147
  • [49] Design Theory of Full Face Rock Tunnel Boring Machine Transition Cutter Edge Angle and Its Application
    ZHANG Zhaohuang
    MENG Liang
    SUN Fei
    Chinese Journal of Mechanical Engineering, 2013, (03) : 541 - 546
  • [50] Design Theory of Full Face Rock Tunnel Boring Machine Transition Cutter Edge Angle and Its Application
    ZHANG Zhaohuang
    MENG Liang
    SUN Fei
    Chinese Journal of Mechanical Engineering, 2013, 26 (03) : 541 - 546