Fuzzy Resource-Constrained Project Scheduling Problem for Software Development

被引:0
作者
WANG XianggangHUANG Wei Department of Information EconomicsShenzhen Institute of Information TechnologyShenzhen GuangdongChina State Key Laboratory of Software EngineeringWuhan UniversityWuhan HubeiChina [1 ,2 ,1 ,518029 ,2 ,430072 ]
机构
关键词
project scheduling problem; fuzzy simulation; genetic algorithm; hybrid intelligent algorithm;
D O I
暂无
中图分类号
TP311.52 [];
学科分类号
081202 ; 0835 ;
摘要
This paper presents a new method to solve the resource-constrained project scheduling problem for software development. In this method,activity duration times are described as fuzzy variables and resource-constrained software project scheduling problems are described as fuzzy programming models. First,how to model the software project scheduling problem under the fuzzy environment conditions is proposed. Second,in order to satisfy the different requirements of decision-making,two novel fuzzy project scheduling models,expected cost model and credibility maximization model,are suggested. Third,a hybrid intelligent algorithm integrated by genetic algorithm and fuzzy simulation is designed to solve the above two fuzzy programming models. Numerical experiments illustrate the effectiveness of the hybrid intelligent algorithm.
引用
收藏
页码:25 / 30
页数:6
相关论文
共 3 条
[1]   Time-line based model for software project scheduling with genetic algorithms [J].
Chang, Carl K. ;
Jiang, Hsin-yi ;
Di, Yu ;
Zhu, Dan ;
Ge, Yujia .
INFORMATION AND SOFTWARE TECHNOLOGY, 2008, 50 (11) :1142-1154
[2]   Stochastic network project scheduling with non-consumable limited resources [J].
GolenkoGinzburg, D ;
Gonik, A .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1997, 48 (01) :29-37
[3]   CHANCE-CONSTRAINED PROGRAMMING [J].
CHARNES, A ;
COOPER, WW .
MANAGEMENT SCIENCE, 1959, 6 (01) :73-79