A two-phase tabu search approach to scheduling optimization in container terminals

被引:0
作者
ZENG Qingcheng and YANG Zhongzhen Transportation and Logistics College Dalian Maritime University Dalian China [116026 ]
机构
关键词
two-phase tabu search; container terminal; quay crane scheduling; yard trailer routing;
D O I
暂无
中图分类号
U695.22 [];
学科分类号
1201 ;
摘要
An optimization model for scheduling of quay cranes (QCs) and yard trailers was proposed to improve the overall efficiency of container terminals. To implement this model, a two-phase tabu search algorithm was designed. In the QCs scheduling phase of the algorithm, a search was performed to determine a good QC unloading operation order. For each QC unloading operation order generated during the QC's scheduling phase, another search was run to obtain a good yard trailer routing for the given QC's unloading order. Using this information, the time required for the operation was estimated, then the time of return to availability of the units was fed back to the QC scheduler. Numerical tests show that the two-phase Tabu Search algorithm searches the solution space efficiently, decreases the empty distance yard trailers must travel, decreases the number of trailers needed, and thereby reduces time and costs and improves the integration and reliability of container terminal operation systems.
引用
收藏
页码:44 / 50
页数:7
相关论文
共 8 条
[1]  
A multiple-crane-constrained scheduling problem in a container terminal. BISH E K. European Journal of Operational Research . 2003
[2]  
Dynamic crane deployment in container storage yards. ZHANG C. Transportation Research . 2002
[3]  
Allocation in a container port: using a continuous location space approach. IMAI A B. Transportation Research . 2005
[4]  
A crane scheduling method for port container terminals. KIM K H. European Journal of Operational Research . 2004
[5]  
Yard trailer routing at a maritime container terminal. NISHIMURA E. Transportation Research . 2005
[6]  
Storage space allocation in container terminals. ZHANG C. Transportation Research . 2003
[7]  
Yard crane scheduling in port container terminals. Ng W C,MAK K L. Journal of Applied Mathematics . 2005
[8]  
A two-phase tabu search approach to the location routing problem. DILEK T,LAURA I B. European Journal of Operational Research . 1999