A simulation-based two-stage interval-stochastic programming model for water resources management in Kaidu-Konqi watershed,China

被引:0
作者
Yue HUANGXi CHENYongPing LIAnMing BAOYongGang MA College of Urban and Environmental SciencesPeking UniversityBeijing China State Key Laboratory of Desert and Oasis EcologyXinjiang Institute of Ecology and GeographyChinese Academy of SciencesUrumqi China MOE Key Laboratory of Regional Energy Systems OptimizationSinoCanada Resources and Environmental Research AcademyNorth China Electric Power UniversityBeijing China Xinjiang Remote Sensing CenterUrumqi China [1 ,2 ,2 ,3 ,2 ,2 ,4 ,1 ,100871 ,2 ,830011 ,3 ,102206 ,4 ,830011 ]
机构
关键词
optimization; two-stage stochastic programming; uncertainty; water resources management; hydrological model; Kaidu-Konqi watershed; Tarim River Basin;
D O I
暂无
中图分类号
TV213.4 [水利资源的管理、保护与改造];
学科分类号
082802 ;
摘要
This study presented a simulation-based two-stage interval-stochastic programming(STIP) model to support water resources management in the Kaidu-Konqi watershed in Northwest China.The modeling system coupled a distributed hydrological model with an interval two-stage stochastic programing(ITSP).The distributed hydrological model was used for establishing a rainfall-runoff forecast system,while random parameters were provided by the statistical analysis of simulation outcomes.The developed STIP model was applied to a real case of water resources management planning in Kaidu-Konqi watershed,where three scenarios with different water resources management policies were analyzed.The results indicated that water shortage mainly occurred in agriculture,ecology and forestry sectors.In comparison,the water demand from municipality,industry and stockbreeding sectors can be satisfied due to their lower consumptions and higher economic values.Different policies for ecological water allocation can result in varied system benefits,and can help to identify desired water allocation plans with a maximum economic benefit and a minimum risk of system disruption under uncertainty.
引用
收藏
页码:390 / 398
页数:9
相关论文
共 7 条
[1]   Analysis of Solution Methods for Interval Linear Programming [J].
Huang, G. H. ;
Cao, M. F. .
JOURNAL OF ENVIRONMENTAL INFORMATICS, 2011, 17 (02) :54-64
[2]   The coupled routing and excess storage (CREST) distributed hydrological model [J].
Wang, Jiahu ;
Yang, Hong ;
Li, Li ;
Gourley, Jonathan J. ;
Sadiq, Khan I. ;
Yilmaz, Koray K. ;
Adler, Robert F. ;
Policelli, Frederick S. ;
Habib, Shahid ;
Irwn, Daniel ;
Limaye, Ashutosh S. ;
Korme, Tesfaye ;
Okello, Lawrence .
HYDROLOGICAL SCIENCES JOURNAL-JOURNAL DES SCIENCES HYDROLOGIQUES, 2011, 56 (01) :84-98
[3]   A fuzzy-based simulation method for modelling hydrological processes under uncertainty [J].
Huang, Y. ;
Chen, X. ;
Li, Y. P. ;
Huang, G. H. ;
Liu, T. .
HYDROLOGICAL PROCESSES, 2010, 24 (25) :3718-3732
[4]   An inexact two-stage water management model for planning agricultural irrigation under uncertainty [J].
Li, W. ;
Li, Y. P. ;
Li, C. H. ;
Huang, G. H. .
AGRICULTURAL WATER MANAGEMENT, 2010, 97 (11) :1905-1914
[5]   Enhancing Remediation of LNAPL Recovery through a Response-Surface-Based Optimization Approach [J].
Qin, Xiaosheng ;
Huang, Guohe ;
Yu, Hui .
JOURNAL OF ENVIRONMENTAL ENGINEERING, 2009, 135 (10) :999-1008
[6]  
ITOM: an interval-parameter two-stage optimization model for stochastic planning of water resources systems[J] . Imran Maqsood,Guohe Huang,Yuefei Huang,Bing Chen.Stochastic Environmental Research and Risk Assessment . 2005 (2)
[7]  
Field investigation and hydrological modeling of a subarctic wetland—the Deer River Watershed .2 L Jing,B Chen. J Environ Inform . 2011