Operation optimization of the steel manufacturing process: A brief review

被引:4
作者
Zhao-jun Xu [1 ]
Zhong Zheng [1 ]
Xiao-qiang Gao [2 ]
机构
[1] College of Material Science and Engineering, Chongqing University
[2] School of Economics and Business Administration, Chongqing University
基金
中国国家自然科学基金;
关键词
intelligent manufacturing; operation optimization; steel manufacturing process; process simulation; production planning; production scheduling;
D O I
暂无
中图分类号
TF4 [钢铁冶炼(黑色金属冶炼)(总论)];
学科分类号
080602 ;
摘要
Against the realistic background of excess production capacity, product structure imbalance, and high material and energy consumption in steel enterprises, the implementation of operation optimization for the steel manufacturing process is essential to reduce the production cost, increase the production or energy efficiency, and improve production management. In this study, the operation optimization problem of the steel manufacturing process, which needed to go through a complex production organization from customers’ orders to workshop production, was analyzed. The existing research on the operation optimization techniques, including process simulation, production planning, production scheduling, interface scheduling, and scheduling of auxiliary equipment, was reviewed. The literature review reveals that, although considerable research has been conducted to optimize the operation of steel production, these techniques are usually independent and unsystematic.Therefore, the future work related to operation optimization of the steel manufacturing process based on the integration of multi technologies and the intersection of multi disciplines were summarized.
引用
收藏
页码:1274 / 1287
页数:14
相关论文
共 80 条
  • [1] 中国钢铁行业超低排放之路
    邢奕
    张文伯
    苏伟
    温维
    赵秀娟
    于敬校
    [J]. 工程科学学报, 2021, 43 (01) : 1 - 9
  • [2] 中厚板组板及板坯设计的智能优化模型和系统
    郑忠
    王永周
    卢义
    高小强
    [J]. 钢铁, 2020, 55 (04) : 53 - 59
  • [3] 炼钢-精炼-连铸脱磷钢包调度算法研究
    刘炜
    庞新富
    柴天佑
    [J]. 控制工程, 2019, 26 (04) : 790 - 798
  • [4] 中厚板坯料优化设计系统研究与应用
    郑忠
    呼万哲
    龙建宇
    高小强
    [J]. 东北大学学报(自然科学版), 2017, 38 (10) : 1405 - 1410
  • [5] 时空约束下连铸车间天车调度的多目标建模与求解
    高小强
    李盼
    龙建宇
    郑忠
    [J]. 系统工程理论与实践, 2017, (09) : 2373 - 2383
  • [6] An Optimized Oxygen System Scheduling With Electricity Cost Consideration in Steel Industry[J]. Zhongyang Han,Jun Zhao,Wei Wang.IEEE/CAA Journal of Automatica Sinica. 2017(02)
  • [7] 中厚板考虑母板和板坯规格不确定性的下料问题建模及求解
    呼万哲
    郑忠
    龙建宇
    高小强
    [J]. 计算机集成制造系统, 2017, 23 (11) : 2508 - 2517
  • [8] 柔性宽度浇次计划编制的一种混合改进算法
    杨凡
    李歧强
    王桂荣
    [J]. 控制与决策, 2015, 30 (02) : 348 - 352
  • [9] 浇次计划编制的混合启发式—交叉熵算法
    杨凡
    李歧强
    刘珊
    王桂荣
    [J]. 计算机集成制造系统, 2014, 20 (09) : 2241 - 2247
  • [10] 面向多种生产工艺的冶铸轧一体化批量计划优化
    张文学
    李铁克
    [J]. 计算机集成制造系统, 2013, 19 (06) : 1296 - 1303