Modeling and Solving Lot-Splitting Scheduling Problem Based on Process

被引:0
作者
XU Ben-zhu [1 ]
JI Jing [1 ]
FEI Xiao-lu [1 ]
机构
[1] School of Computer and Information, Hefei University of Technology
关键词
flexible job shop scheduling with lot-splitting; batch scheduling strategy based on process; scheduling scheme based on workpiece; different lot-sizing;
D O I
10.19583/j.1003-4951.2015.03.008
中图分类号
TB49 [工厂、车间];
学科分类号
08 ;
摘要
In flexible job-shop batch scheduling problem, the optimal lot-size of different process is not always the same because of different processing time and set-up time. Even for the same process of the same workpiece, the choice of machine also affects the optimal lot-size. In addition, different choices of lot-size between the constrained processes will impact the manufacture efficiency. Considering that each process has its own appropriate lot-size, we put forward the concept of scheduling with lot-splitting based on process and set up the scheduling model of lot-splitting to critical path process as the core. The model could update the set of batch process and machine selection strategy dynamically to determine processing route and arrange proper lot-size for different processes, to achieve the purpose of optimizing the makespan and reducing the processing batches effectively. The experiment results show that, comparing with lot-splitting scheduling scheme based on workpiece, this model optimizes the makespan and improves the utilization efficiency of the machine. It also greatly decreases the machined batches(42%) and reduces the complexity of shop scheduling production management.
引用
收藏
页码:49 / 55
页数:7
相关论文
empty
未找到相关数据