Unexpected sedimentation patterns upstream and downstream of the Three Gorges Reservoir:Future risks

被引:2
作者
Yifan Huang [1 ,2 ]
Jinsheng Wang [1 ,2 ]
Mei Yang [3 ]
机构
[1] College of Water Sciences,Beijing Normal University
[2] Engineering Research Center of Groundwater Pollution Control and Remediation,Ministry of Education
[3] National Geomatics Center of China
关键词
Yangtze River; Three Gorges Reservoir; Sedimentation; Risk;
D O I
暂无
中图分类号
TV142 [泥沙运动];
学科分类号
081502 ;
摘要
This paper summarizes the latest developments,future prospects,and proposed countermeasures of reservoir sedimentation and channel scour downstream of the Three Gorges Reservoir(TGR)on the Yangtze River in China.Three key results have been found.(1)The incoming sediment load to the TGR has been significantly lower than expected.(2)The accumulated volume of sediment deposition in the TGR is smaller than expected because the overall sediment delivery ratio is relatively low,and the deposition in the near-dam area of the TGR is still developing.(3)River bed scour in the river reaches downstream of the Gezhouba Dam is still occurring and channel scour has extended to reaches as far downstream as the Hukou reach.Significantly,sedimentation of the TGR is less problematic than expected since the start of operation of the TGR on the one hand;on the other hand,the possible increases in sediment risks from dependence on upstream sediment control,deposition in the reservoir,and scour along middle Yangtze River should be paid more attention.(1)Sediment trapped by dams built along the upper Yangtze River and billion tons of loose materials on unstable slopes produced by the Wenchuan Earthquake could be new sediment sources for the upper Yangtze River.More seriously,possible release of this sediment into the upper Yangtze River due to new earthquakes or extreme climate events could overwhelm the river system,and produce catastrophic consequences.(2)Increasing sediment deposition in the TGR is harmful to the safety and efficiency of project operation and navigation.(3)The drastic scour along the middle Yangtze River has intensified the down-cutting of the riverbed and erosion of revetment,it has already led to increasing risk to flood control structures and ecological safety.It is suggested to continue the Field Observation Program,to initiate research programs and to focus on risks of sedimentation.
引用
收藏
页码:108 / 117
页数:10
相关论文
共 34 条
[1]  
Field measurements of settling velocities of fine sediments in Three Gorges Reservoir using ADV[J]. Wenjie Li,Shengfa Yang,Jiang Hu,Xuhui Fu,Peng Zhang.International Journal of Sediment Research. 2016(03)
[2]   长江上游流域水电开发现状与存在的问题 [J].
姚磊 ;
陈盼盼 ;
胡利利 ;
李亦秋 .
绵阳师范学院学报, 2016, 35 (02) :91-97
[3]   我国多沙河流水库“蓄清排浑”运用方式的发展与实践 [J].
胡春宏 .
水利学报, 2016, 47 (03) :283-291
[4]   关于三峡水库排沙调度的建议 [J].
潘庆燊 .
长江科学院院报, 2015, 32 (12) :1-7
[5]   长江上游梯级水库群拦沙效果分析 [J].
段炎冲 ;
李丹勋 ;
王兴奎 .
四川大学学报(工程科学版), 2015, 47 (06) :15-23
[6]   三峡工程运行后泥沙问题与江湖关系变化 [J].
胡春宏 ;
王延贵 .
长江科学院院报, 2014, 31 (05) :107-116
[7]  
Changes in runoff and sediment load from major Chinese rivers to the Pacific Ocean over the period 1955-2010[J]. Cheng LIU,Jueyi SUI,Yun HE,Faye HIRSHFIELD.International Journal of Sediment Research. 2013(04)
[8]   三峡水库的泥沙问题 [J].
张仁 .
水力发电, 2009, 35 (12) :10-11+45
[9]   三峡水库入库泥沙数量已经、并继续大幅度减少——对“关于三峡水库入库泥沙条件的讨论”一文的回应 [J].
韩其为 .
水力发电学报, 2006, (06) :73-78
[10]   长江三峡工程的泥沙问题及对策 [J].
张仁 .
中国三峡建设, 1995, (03) :18-19+47