共 18 条
[1]
Anandan P.D., Hiwarkar V., Sayed M.S., Ferreira P., Lohse N., Linear constraint programming for costoptimized configuration of modular assembly systems, 49th CIRP Conference on Manufacturing Systems (CIRP-CMS 2016), (2016)
[2]
Barnes R., Motion and Time Study: Design and Measurement of Work U.S.A., (1963)
[3]
Bermudez-Colina Y., Aplicaciones de programación lineal, entera y mixta, Geniería Industrial, Actualidad y Nuevas Tendencias, pp. 85-104, (2011)
[4]
Coto E., Algoritmos Básicos de Grafos, (2003)
[5]
Fraustro R.J., Implementación de Algoritmos para la Implementación de Trayectorias para Brazos Manipuladores, (2008)
[6]
Jadhav J.R., Mantha S.S., Rane S.B., Development of framework for sustainable Lean implementation: An ISM approach, Journal of Industrial Engineering International, 10, 3, pp. 1-27, (2014)
[7]
Kai N., Yao-Ting Z., Yue-Peng M., Shortest Path Analysis Based on Dijkstra's Algorithm in Emergency Response System, Indonesian Journal of Electrical Engineering and Computer Science, 12, 5, pp. 3476-3482, (2014)
[8]
Kanawaty G., Introducción Al Estudio Del Trabajo, (1996)
[9]
Kellegoz T., Toklu B., A priority rule-based constructive heuristic and an improvement method for balancing assembly lines with parallel multi-manned workstations, International Journal of Production Research, 53, 3, pp. 736-756, (2015)
[10]
Kleinberg J., Tardos E., Algorithm Design Boston, (2006)