共 26 条
[21]
Ribe V., Nehrenhein E., Odlare M., Waara S., Leaching of contaminants from untreated pine bark in a batch study: Chemical analysis and ecotoxicological evaluation, J. Hazard. Mater., 163, 2-3, pp. 1096-1100, (2009)
[22]
Salihoglu G., Pinarli V., Steel foundry electric arc furnace dust management: Stabilization by using lime and Portland cement, J Hazard. Mater., 153, 3, pp. 1110-1116, (2008)
[23]
Salihoglu G., Pinarli V., Salihoglu N.K., Karaca G., Properties of steel foundry electric arc furnace dust solidified/stabilized with Portland cement, J. Environ. Manage., 85, 1, pp. 190-197, (2007)
[24]
Srivastava S., Chaudhary R., Khale D., Influence of pH, curing time and environmental stress on the immobilization of hazardous waste using activated fly ash, J. Hazard. Mater., 153, 3, pp. 1103-1109, (2008)
[25]
Stephan D., Maleki H., Knofel D., Eber B., Hardtl R., Influence of Cr, Ni and Zn on the properties of pure clinker phases Part II. C3A and C4AF, Cem. Concr. Res., 29, 5, pp. 651-657, (1999)
[26]
Stephan D., Maleki H., Knofel D., Eber B., Hardtl R., Influence of Cr, Ni and Zn on the properties of pure clinker phases Part I. C3S, Cem. Concr. Res., 29, 4, pp. 545-552, (1999)