A new multi-objective genetic algorithm for solving the fuzzy stochastic multi-manned assembly line balancing problem

被引:0
作者
Zacharia, Paraskevi Th. [1 ]
Nearchou, Andreas C. [2 ]
机构
[1] Univ West Attica, Dept Ind Design & Prod Engn, Athens, Greece
[2] Univ Patras, Dept Business Adm, Patras 26500, Greece
关键词
Assembly lines; multi-objective optimisation; Pareto solutions; fuzzy random variables; workload smoothness; MODEL; WORKERS;
D O I
10.1080/00207543.2025.2526164
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
By incorporating the uncertainty and imprecision inherent in real-world production systems, this paper introduces the multi-manned assembly line balancing problem (MMALBP) with fuzzy stochastic task processing times. MMALBP has recently emerged as a key challenge in flow-line production systems manufacturing large-scale products (e.g. the automotive industry), where multiple workers collaborate at the same station to perform different operations simultaneously on a single product. MMALBP is a decision problem that involves partitioning assembly tasks among stations and scheduling them across multiple workers while optimising key operational objectives related to capacity and/or operational cost of the line. To enhance realism and decision-making, a new problem termed fs-MMALBP is introduced, which models task time uncertainties as fuzzy stochastic variables. The objective is to optimise three conflicting criteria: (1) minimising the number of the stations, (2) minimising the total number of the workers employed along all the stations and (3) maximising the workload smoothness across the line. Given the NP-hard nature of the problem, a new robust multi-objective genetic algorithm (MOGA) is developed to identify the Pareto-optimal set. Simulation results show that MOGA effectively produces well-distributed Pareto-optimal solutions under fuzzy-stochastic uncertainty, with improved hypervolume and competitive CPU times across benchmark instances.
引用
收藏
页数:23
相关论文
共 31 条
[1]   Matheuristics for mixed-model assembly line balancing problem with fuzzy stochastic processing time [J].
Anh, Truong Tran Mai ;
Hop, Nguyen Van .
APPLIED SOFT COMPUTING, 2024, 160
[2]   A taxonomy of line balancing problems and their solution approaches [J].
Battaia, Olga ;
Dolgui, Alexandre .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 142 (02) :259-277
[3]   Assembly line balancing: What happened in the last fifteen years? [J].
Boysen, Nils ;
Schulze, Philipp ;
Scholl, Armin .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 301 (03) :797-814
[5]   Constraint programming model for multi-manned assembly line balancing problem [J].
Cil, Zeynel Abidin ;
Kizilay, Damla .
COMPUTERS & OPERATIONS RESEARCH, 2020, 124
[6]  
Coello CAC, 2002, IEEE C EVOL COMPUTAT, P1051, DOI 10.1109/CEC.2002.1004388
[7]   A fast and elitist multiobjective genetic algorithm: NSGA-II [J].
Deb, K ;
Pratap, A ;
Agarwal, S ;
Meyarivan, T .
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (02) :182-197
[8]  
Deb K ., 2001, Multi-objective optimization using evolutionary algorithms, V16
[9]   Assembly line balancing and group working: A heuristic procedure for workers' groups operating on the same product and workstation [J].
Dimitriadis, SG .
COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (09) :2757-2774
[10]   A mathematical model and ant colony algorithm for multi-manned assembly line balancing problem [J].
Fattahi, Parviz ;
Roshani, Abdolreza ;
Roshani, Abdolhassan .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 53 (1-4) :363-378