共 11 条
[1]
Rui C., Raimundo D., Felipe G., Et al., Track-Bridge Interaction on High-Speed Railways, pp. 149-164, (2009)
[2]
Gao X., Research and Design of 60 kg/m Rail Expansion Joints of 420 mm Expansion Capacity, Merto and Light Rail, 6, pp. 26-28, (2003)
[3]
Wang J., Zhang Y., Li J., Et al., Seismic Wave Passage effect's Influences on Longitudinal Seismic Pounding Response for Continuous Girder Bridges, Engineering Mechanics, 24, 11, pp. 100-105, (2007)
[4]
Huang Y., Yan G., Liu L., Effects of Rail Restraints on Longitudinal Seismic Response of Railway Bridges, Journal of the China Railway Society, 24, 5, pp. 124-128, (2002)
[5]
Xie X., Wang Y., Chen L., Effect of Rail Restraints on Seismic Response of Cushioning Railway Bridges, Journal of the China Railway Society, 34, 6, pp. 75-82, (2012)
[6]
Yan B., Dai G., Xu Q., Seismic Response of Railway Track-bridge System under Travelling Wave Effect, Journal of Vibration Engineering, 26, 3, pp. 357-362, (2013)
[7]
Yan M., Wei X., Wang P., Et al., Research on Longitudinal Seismic Responses of Continuous Welded Rails on Large-span Bridges, Journal of the China Railway Society, 36, 5, pp. 96-102, (2014)
[8]
Petrangeli M., Tamagno C., Tortolini P., Numerical Analysis of Track: Structure Interaction and Time Domain Resonance, Proceedings of the Insitution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 222, 4, pp. 345-353, (2008)
[9]
Wilson E.L., Three-dimensional Static and Dynamic Analysis of Structures, (2002)
[10]
Xie K., Xu J., Wei X., Et al., Research on the Calculation of Stress Relief of Additional Expansion Force of Continuously Welded Rails on Bridge, Railway Standard Design, 4, pp. 28-31, (2012)