Social stability risk of public-private-partnership waste-to-energy incineration projects in China: Social network analysis of stakeholders

被引:0
作者
Wang, Ke [1 ]
Liu, Kebei [2 ]
Du, Yanjie [3 ]
Zheng, Tao [4 ]
机构
[1] Sichuan Normal Univ, Admiss & Employment Off, Chengdu, Peoples R China
[2] Jinan Univ, Int Business Sch, Guangzhou, Peoples R China
[3] Sichuan Normal Univ, Sch Business, Chengdu, Peoples R China
[4] Sichuan Normal Univ, Sch Econ & Management, Chengdu, Peoples R China
基金
中国国家社会科学基金;
关键词
Waste-to-energy incineration projects; Social stability risk; PPP project; Social network analysis (SNA); stakeholder analysis; CONSTRUCTION PROJECTS; MANAGEMENT;
D O I
10.1016/j.sftr.2025.100958
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In China, Public-Private Partnership (PPP) projects for waste incineration power generation have significantly aided social and economic development; however, they often result in societal risks that compromise the stability of society. A key element influencing the risk to social stability in PPP projects for trash incineration power generation is the diversity of the parties involved and their intricate interrelationships. Prior research on the risk to societal stability has mostly concentrated on risk identification and evaluation, ignoring stakeholder relationships and the connections between various risks. Through a review of the literature and stakeholder interviews, this study examines the pertinent risk factors and their interactions identified by social networks for PPP projects for waste incineration power generation. A multi-channel project financial system, effective group event avoidance mechanism, and comprehensive project schedule control system are suggested to reduce threats to social stability. To provide guidance for the social stability risk management of PPP projects for waste incineration power production in China, this study integrates stakeholders with risk management using social network analysis.
引用
收藏
页数:10
相关论文
共 43 条
[1]   Project stakeholder analysis as an environmental interpretation process [J].
Aaltonen, Kirsi .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (02) :165-183
[2]  
[Anonymous], 1996, GUID PROJ MAN BOD KN
[3]  
BOURDIEU P, 1987, HASTINGS LAW J, V38, P805
[4]   Choosing project risk management techniques. A theoretical framework [J].
Cagliano, Anna Corinna ;
Grimaldi, Sabrina ;
Rafele, Carlo .
JOURNAL OF RISK RESEARCH, 2015, 18 (02) :232-248
[5]   Study on Social Risk Appraise of Construction Project in China -A Case From Guangzhou [J].
Chen, Lin ;
Wu, Kai-ze ;
Tan, Jian-hui ;
Li, Ming-fei .
ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 :2916-+
[6]  
Chinowsky Paul, 2012, Engineering Project Organization Journal, V2, P15, DOI 10.1080/21573727.2011.635647
[7]  
Dogan SZ, 2015, J MANAGE ENG, V31, DOI [10.1061/(ASCE)ME.1943-5479.8888255, 10.1061/(ASCE)ME.1943-5479.0000255]
[8]   Effect of energy from waste technologies on the risk profile of public-private partnership waste treatment projects of India [J].
Dolla, Tharun ;
Laishram, Boeing .
JOURNAL OF CLEANER PRODUCTION, 2021, 284
[9]  
Freeman R. E., 1984, STRATEG MANAG
[10]   The Evolutionary Game of Stakeholders' Coordination Mechanism of New Energy Power Construction PPP Project: A China Case [J].
Gao, Lei ;
Zhao, Zhen-Yu .
SUSTAINABILITY, 2020, 12 (03)