共 29 条
[1]
Turner R., The Handbook of Project-Based Management, (2008)
[2]
Wang J., Constraint-based schedule repair for product development projects with time-limited constraints, International Journal of Production Economics, 95, 3, pp. 399-414, (2005)
[3]
Brucker P., Drexl A., Mohring R., Resource-constrained project scheduling: Notation, classification, models, and methods, European Journal of Operational Research, 112, 1, pp. 3-41, (1999)
[4]
Demeulemeester E., Herroelen W., Project Scheduling - A Research Handbook, (2002)
[5]
Goldratt E.M., Critical Chain, (1997)
[6]
Leach L.P., Critical Chain Project Management, (2005)
[7]
Newbold R.C., Project Management in the Fast Lane: Applying the Theory of Constraints, (1998)
[8]
Tukel O.I., Rom W.O., Eksioglu S.D., An investigation of buffer sizing techniques in critical chain scheduling, European Journal of Operational Research, 172, 2, pp. 401-416, (2006)
[9]
Chu C., Buffer sizing and critical chain project management, Computer Integrated Manufacturing Systems, 14, 5, pp. 1029-1035, (2008)
[10]
Bie L., Cui N., Capacity constrain buffer sizing method for critical chain multi-project scheduling, Computer Integrated Manufacturing Systems, 17, 7, pp. 1534-1540, (2011)