共 16 条
[1]
Adams J., 1988, The shifting bottleneck procedure for job shop scheduling, V34, P391, DOI [10.1287/mnsc.34.3.391, DOI 10.1287/MNSC.34.3.391]
[2]
Applegate D., 1991, ORSA Journal on Computing, V3, P149, DOI 10.1287/ijoc.3.2.149
[3]
Barnes J., 1996, Graduate Program in Operations and Industrial Engineering
[4]
BEASLEY JE, 1990, J OPER RES SOC, V41, P1069, DOI 10.1038/sj/jors/0411109
[5]
Brandimarte P., 1993, Annals of Operations Research, V41, P157, DOI 10.1007/BF02023073
[6]
Col G.D., 2021, Large-scale benchmarks for the job shop scheduling problem
[8]
Fisher Henry., 1963, Industrial scheduling, V3, P225
[9]
HURINK J, 1994, OR SPEKTRUM, V15, P205, DOI 10.1007/BF01719451
[10]
Lawrence S., 1984, RESOURCE CONSTRAINED