Safety plan modelling for resource-constrained construction projects to optimise cost, time, and safety risk

被引:0
作者
Shafikhani, Ali Akbar [1 ]
Pouyakian, Mostafa [1 ]
Najafi, Amir Abbas [2 ]
Afshar-Nadjafi, Behrouz [3 ]
Kavousi, Amir [4 ]
机构
[1] Shahid Beheshti Univ Med Sci, Sch Publ Hlth & Safety, Dept Occupat Hlth & Safety Engn, Tehran, Iran
[2] KN Toosi Univ Technol, Dept Ind Engn, Tehran, Iran
[3] Islamic Azad Univ, Fac Ind & Mech Engn, Dept Ind Engn, Qazvin Branch, Qazvin, Iran
[4] Shahid Beheshti Univ Med Sci, Sch Publ Hlth & Safety, Dept Epidemiol, Tehran, Iran
关键词
safety risks; equipment planning; project-scheduling; construction; RCPSP; NSGA-II; TRADE-OFF; ALGORITHM;
D O I
10.1504/IJCIS.2025.146879
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The intense competition to achieve project goals has increased due to limited resources in construction projects. No studies have compared the trade-off between time, cost, and safety while considering resource and equipment constraints. Equipment constraints may affect project scheduling and increase safety risks. Therefore, a project scheduling model that considers equipment constraints, time, cost, and safety risks is needed. This study aims to optimise cost, time, and safety risk by modelling safety plans in project scheduling problems with resource constraints. By solving this model, feasible solutions for time, cost, and safety risk trade-offs are provided. In addition, the model could also evaluate the risks of project activity, the risk of equipment and overtime, and minimise the overall safety risk of the project.
引用
收藏
页码:228 / 251
页数:25
相关论文
共 43 条
[1]   Developing a Wearable Device Based on IoT to Monitor the Use of Personal Protective Equipment in Construction Projects [J].
Abbasianjahromi, Hamidreza ;
Ghazvini, Ehsan Sohrab .
IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2022, 46 (03) :2561-2573
[2]   Uncertainty assessments of linear time-cost tradeoffs using neutrosophic set [J].
Abdel-Basset, Mohamed ;
Ali, Mumtaz ;
Atef, Asmaa .
COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 141
[3]   Nondominated Archiving Multicolony Ant Algorithm in Time-Cost Trade-Off Optimization [J].
Afshar, A. ;
Ziaraty, A. Kasaeian ;
Kaveh, A. ;
Sharifi, F. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (07) :668-674
[4]  
Afshar A., 2014, INT J OPTIMIZATION C, V4, P433
[5]   Evaluating the effectiveness of strategies for implementation of health and safety programs on construction sites in Nigeria: A mixed-method study [J].
Aka, Adefemi ;
Awuzie, Bankole ;
Emuze, Fidelis ;
Shittu, Abdullateef Adewale .
JOURNAL OF SAFETY RESEARCH, 2023, 85 :172-181
[6]  
Artigues C., 2013, Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications, P1
[7]  
Banihashemi SA, 2022, JORDAN J CIV ENG, V16, P355
[8]   Barriers to safety program implementation in the construction industry [J].
Buniya, Mohanad K. ;
Othman, Idris ;
Sunindijo, Riza Yosia ;
Kineber, Ahmed Farouk ;
Mussi, Eveline ;
Ahmad, Hayroman .
AIN SHAMS ENGINEERING JOURNAL, 2021, 12 (01) :65-72
[9]   Multi-objective optimization of proton exchange membrane fuel cells by RSM and NSGA-II [J].
Chen, Zhijie ;
Zuo, Wei ;
Zhou, Kun ;
Li, Qingqing ;
Huang, Yuhan ;
Jiaqiang, E. .
ENERGY CONVERSION AND MANAGEMENT, 2023, 277
[10]   Transforming inherent safety risk in the construction Industry: A safety risk generation and control model [J].
Choe, Sooyoung ;
Leite, Fernanda .
SAFETY SCIENCE, 2020, 124