Bi-Objective Optimization for Uniform Parallel Batch Machine Scheduling under Time-of-Use Tariffs

被引:0
作者
Cheng, Junheng [1 ]
Cheng, Jingya [1 ]
Chu, Feng [2 ]
机构
[1] Fujian Normal Univ, Sch Econ, Fuzhou, Peoples R China
[2] Univ Paris Saclay, Univ Evry, Lab IBISC, Evry, France
来源
2022 IEEE INTERNATIONAL CONFERENCE ON NETWORKING, SENSING AND CONTROL, ICNSC | 2022年
基金
中国国家自然科学基金;
关键词
Bi-objective optimization; batch scheduling; uniform parallel machines; time-of-use tariffs; PROCESSING MACHINE; ALGORITHMS;
D O I
10.1109/ICNSC55942.2022.10004129
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Time-of-Use (ToU) electricity pricing scheme has been widely implemented to alleviate the grid's peak load, under which manufacturing companies obtain a good opportunity to save energy cost through more reasonable production scheduling. As a typical production system, batch processing machine manufacturing system has been widely used in modern manufacturing industry because of its advantages in improving production efficiency and reducing production costs. In this work, a new bi-objective uniform parallel batch machine scheduling problem with different job sizes under ToU tariffs is explored, with the goal of minimizing the total electricity cost and the number of enabled machines. We first establish a mixed integer linear programming model, and then propose an improved model. Both models are solved by CPLEX using the epsilon-constraint method. The calculation results of randomly generated instances prove the effectiveness of the proposed model. At the same time, the calculation results show that the improved model is more effective than the original one.
引用
收藏
页码:604 / 609
页数:6
相关论文
共 21 条
[11]   A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor [J].
Mathirajan, M. ;
Sivakumar, A. I. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 29 (9-10) :990-1001
[12]   Designing time-of-use program based on stochastic security constrained unit commitment considering reliability index [J].
Nikzad, Mehdi ;
Mozafari, Babak ;
Bashirvand, Mandi ;
Solaymani, Soodabeh ;
Ranjbar, Ali Mohamad .
ENERGY, 2012, 41 (01) :541-548
[13]   Economic batch sizing and scheduling on parallel machines under time-of-use electricity pricing [J].
Tan, Mao ;
Duan, Bin ;
Su, Yongxin .
OPERATIONAL RESEARCH, 2018, 18 (01) :105-122
[14]   Minimizing makespan in a two-machine flowshop scheduling with batching and release time [J].
Tang, Lixin ;
Liu, Peng .
MATHEMATICAL AND COMPUTER MODELLING, 2009, 49 (5-6) :1071-1077
[15]  
Uzsoy R., 1997, Production and Operations Management, V6, P57, DOI 10.1111/j.1937-5956.1997.tb00415.x
[17]   Bi-objective optimization of a single machine batch scheduling problem with energy cost consideration [J].
Wang, Shijin ;
Liu, Ming ;
Chu, Feng ;
Chu, Chengbin .
JOURNAL OF CLEANER PRODUCTION, 2016, 137 :1205-1215
[18]   Metrics for quality assessment of a multiobjective design optimization solution set [J].
Wu, J ;
Azarm, S .
JOURNAL OF MECHANICAL DESIGN, 2001, 123 (01) :18-25
[19]   Improved mixed-integer linear programming model and heuristics for bi-objective single-machine batch scheduling with energy cost consideration [J].
Zhang, Shibohua ;
Che, Ada ;
Wu, Xueqi ;
Chu, Chengbin .
ENGINEERING OPTIMIZATION, 2018, 50 (08) :1380-1394
[20]  
Zhou S., 2016, Research on machine batch scheduling of differentiated workpieces