Golden eagle optimizer-based multi-objective optimization model for scheduling construction projects

被引:0
作者
Turkoglu, Harun [1 ]
Arditi, David [2 ]
Polat, Gul [1 ]
机构
[1] Istanbul Tech Univ, Dept Civil Engn, Istanbul, Turkiye
[2] IIT, Dept Civil Architectural & Environm Engn, Chicago, IL USA
关键词
Construction projects; golden eagle optimizer; optimization; scheduling; trade-off; COST TRADE-OFF; PARTICLE SWARM OPTIMIZATION; DISCRETE-TIME; QUALITY TRADEOFF; GA;
D O I
10.1080/01446193.2025.2502461
中图分类号
F [经济];
学科分类号
02 ;
摘要
This study presents a multi-objective optimization model based on the Golden Eagle Optimizer (GEO) that can simultaneously address all of the defined and quantifiable objectives of a construction project. The model's practicality, accuracy, and effectiveness were evaluated in an example project. Furthermore, mathematical and Particle Swarm Optimization (PSO)-based models were developed for the same purpose. Then, these models were applied to the same example project, and the results were compared to the results of the proposed model. The key results of this study are: (1) the optimal compromise solutions differ depending on the objectives addressed and the number of objectives, (2) when there are more than two objectives in an optimization problem, each solution must be evaluated as a whole, not one at a time, and (3) the proposed model obtained exactly the same optimal compromise solution as the mathematical model in an extremely short time when compared to both the mathematical and PSO-based models.
引用
收藏
页数:19
相关论文
共 82 条
[21]   DETERMINING OBJECTIVE WEIGHTS IN MULTIPLE CRITERIA PROBLEMS - THE CRITIC METHOD [J].
DIAKOULAKI, D ;
MAVROTAS, G ;
PAPAYANNAKIS, L .
COMPUTERS & OPERATIONS RESEARCH, 1995, 22 (07) :763-770
[22]   Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolution [J].
Duc Hoc Tran ;
Luong Duc Long .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (05) :623-638
[23]   Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution [J].
Duc-Long Luong ;
Duc-Hoc Tran ;
Phong Thanh Nguyen .
INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (03) :271-283
[24]  
Eberhart R., 1995, P 6 INT S MICR HUM S, P39, DOI [DOI 10.1109/MHS.1995.494215, 10.1109/MHS.1995.494215]
[25]   Time-cost-quality trade-off analysis for highway construction [J].
El-Rayes, K ;
Kandil, A .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (04) :477-486
[26]   Resource levelling optimization model considering float loss impact [J].
El-Sayegh, Sameh .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (05) :639-653
[27]  
El-Sayegh SM, 2017, J FINANC MANAG PROP, V22, P20, DOI 10.1108/JFMPC-02-2016-0007
[28]   Overall multiobjective optimization of construction projects scheduling using particle swarm [J].
Elbeltagi, Emad ;
Ammar, Mohammed ;
Sanad, Haytham ;
Kassab, Moustafa .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2016, 23 (03) :265-282
[29]  
ERENGUC SS, 1993, NAV RES LOG, V40, P25, DOI 10.1002/1520-6750(199302)40:1<25::AID-NAV3220400103>3.0.CO
[30]  
2-2