Exploring the application of artificial intelligence in project management: A systematic literature review

被引:0
作者
Bachari, Mohammad Senisel [1 ]
Solouki, Ali [2 ]
Ghanbari, Hossein [2 ]
机构
[1] Petr Univ Technol, Kut E Abdollah, Iran
[2] Iran Univ Sci & Technol, Sch Engn, Dept Ind Engn, Tehran, Iran
关键词
Project management; Artificial intelligence; Systematic literature review; PMBOK; SUBCONTRACTOR SELECTION; BAYESIAN NETWORKS; RISK-ASSESSMENT; MODEL; METHODOLOGY;
D O I
10.5267/j.jpm.2025.5.002
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Projects play a crucial role in the success and development of industries, organizations and businesses, hence making project management an important practice which needs to be up to date with new trends and modern technology such as artificial intelligence (AI). With the advent of artificial intelligence there have been a number of studies aimed to design and introduce new ways and means of utilizing this phenomenon into project management. This research aims to find AI methods, tools, approaches, models and frameworks for each of the project management knowledge domains introduced by PMboK. The methodology followed the PRISMA guidelines for systematic literature reviews to collect, screen and analyze the literature to find relevant studies. The findings presented bibliographic data on the topic and current trends, frequently used AI methods and project management techniques and tools which benefit from these AI methods under each project management domain.
引用
收藏
页码:451 / 468
页数:18
相关论文
共 136 条
[61]   A Fuzzy-Bayesian Model for Risk Assessment in Power Plant Projects [J].
Islam, Muhammad Saiful ;
Nepal, Madhav .
INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS/INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT/INTERNATIONAL CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES, CENTERIS/PROJMAN / HCIST 2016, 2016, 100 :963-970
[62]  
Jarrahi Mohammad Hossein, 2023, Journal of Business Strategy, P126, DOI 10.1108/JBS-11-2021-0182
[63]   Artificial intelligence in healthcare: past, present and future [J].
Jiang, Fei ;
Jiang, Yong ;
Zhi, Hui ;
Dong, Yi ;
Li, Hao ;
Ma, Sufeng ;
Wang, Yilong ;
Dong, Qiang ;
Shen, Haipeng ;
Wang, Yongjun .
STROKE AND VASCULAR NEUROLOGY, 2017, 2 (04) :230-243
[64]   Modelling optimal risk allocation in PPP projects using artificial neural networks [J].
Jin, Xiao-Hua ;
Zhang, Guomin .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (05) :591-603
[65]  
Joshi N., 2019, Forbes
[66]   The contribution of social media to project management [J].
Kanagarajoo, Muralitheran V. ;
Fulford, Richard ;
Standing, Craig .
INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2020, 69 (04) :834-872
[67]   Siri, Siri, in my hand: Who's the fairest in the land? On the interpretations, illustrations, and implications of artificial intelligence [J].
Kaplan, Andreas ;
Haenlein, Michael .
BUSINESS HORIZONS, 2019, 62 (01) :15-25
[68]   Development and comparative of a new meta-ensemble machine learning model in predicting construction labor productivity [J].
Karatas, Ibrahim ;
Budak, Abdulkadir .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (03) :1123-1144
[69]   A review on genetic algorithm: past, present, and future [J].
Katoch, Sourabh ;
Chauhan, Sumit Singh ;
Kumar, Vijay .
MULTIMEDIA TOOLS AND APPLICATIONS, 2021, 80 (05) :8091-8126
[70]   Project cost risk analysis: A Bayesian networks approach for modeling dependencies between cost items [J].
Khodakarami, Vahid ;
Abdi, Abdollah .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (07) :1233-1245