Energy, exergy, and economic (3E) analysis of novel heat recovery systems for recovery and optimization of waste flows at a combined cycle power plant

被引:1
作者
Asadi, Farzad [1 ]
Jahangiri, Ali [1 ]
Ameri, Mohammad [1 ]
Saedi, Ali [1 ]
机构
[1] Shahid Beheshti Univ, Fac Mech & Energy Engn, Tehran, Iran
关键词
Waste heat recovery; Combined cycle power plant; MED; Organic Rankine cycle; Exergy analysis; Optimization; ORGANIC RANKINE-CYCLE; THERMOECONOMIC ANALYSIS; PERFORMANCE ANALYSIS; MED DESALINATION; WORKING FLUIDS; TEMPERATURE; WATER; ORC; GENERATION; ENGINE;
D O I
10.1016/j.psep.2025.106987
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In different industries, waste heat recovery is considered an efficient approach of maximizing energy utilization. This study addresses the recovery of waste flows from the blowdown tanks (BTs) and deaerators of a Combined Cycle Power Plant (CCPP). To this end, three waste heat recovery scenarios were proposed using the organic Rankine cycle (ORC) and the distributed boosted multi-effect distillation (DBMED) integrated with the CCPP: Scenario 1 (ORC-DBMED), Scenario 2 (ORC-D-DBMED), and Scenario 3 (ORC P-DBMED). The proposed scenarios were evaluated through the energy, exergy, and economic (3E) analysis and were then optimized from an economic perspective. The main exergy destruction occurred in the combustion chamber of the CCPP, the evaporator of the ORC, and the condenser of the DBMED, accounting for 55.4 %, 52 %, and 29.9 %, respectively. According to the results, Scenario 1 demonstrated the shortest payback period (PP) of 1.62 years, while Scenario 2 achieved a slightly higher energy efficiency of 46.7 %. However, the payback period for Scenario 2 was longer, at 2.34 years. Scenario 1, which exhibits superior economic conditions compared to other scenarios, was proposed in this study. In this cycle, 730.1 kW of power and 278.56 m3/day of water were saved by recovering the flows of vents and producing water in the DBMED process. The integration of the cycle led to a 0.21 % rise in the energy efficiency and 0.13% increase in exergy efficiency for the CCPP.
引用
收藏
页数:17
相关论文
共 69 条
[51]   Comparative analysis of Gasifier-CI engine performance and emissions characteristics using diesel with producer gas derived from coal- briquette-coconut shell-mahua feedstock and its blends [J].
Raj, Reetu ;
Tirkey, Jeewan Vachan ;
Jena, Priyaranjan ;
Prajapati, Lawalesh Kumar .
ENERGY, 2024, 293
[52]   Techno-economic assessment of sugarcane bagasse pith-based briquette production and performance analysis of briquette feed gasifier-engine system [J].
Raj, Reetu ;
Tirkey, Jeewan Vachan .
JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2023, 345
[53]   A procedure to select working fluids for Solar Organic Rankine Cycles (ORCs) [J].
Rayegan, R. ;
Tao, Y. X. .
RENEWABLE ENERGY, 2011, 36 (02) :659-670
[54]   Feasibility study and 3E analysis of blowdown heat recovery in a combined cycle power plant for utilization in Organic Rankine Cycle and greenhouse heating [J].
Saedi, Ali ;
Jahangiri, Ali ;
Ameri, Mohammad ;
Asadi, Farzad .
ENERGY, 2022, 260
[55]   Multi-objective thermo-economic optimization of a combined organic Rankine cycle and vapour compression refrigeration cycle [J].
Salim, Mohammad Saad ;
Kim, Man-Hoe .
ENERGY CONVERSION AND MANAGEMENT, 2019, 199
[56]  
Sarkar J., 2012, ARCH THERMODYN, V33, P23, DOI [DOI 10.2478/V10173-012-0026-8, 10.1002/er, DOI 10.1002/ER]
[57]   Parametric and working fluid analysis of a dual-loop organic Rankine cycle (DORC) used in engine waste heat recovery [J].
Shu, Gequn ;
Liu, Lina ;
Tian, Hua ;
Wei, Haiqiao ;
Yu, Guopeng .
APPLIED ENERGY, 2014, 113 :1188-1198
[58]   Investigation of a new heat recovery system for simultaneously producing power, cooling and distillate water [J].
Tayyeban, Edris ;
Deymi-Dashtebayaz, Mahdi ;
Gholizadeh, Mohammad .
ENERGY, 2021, 229
[59]   Thermo-economic assessment of a micro CHP system fuelled by geothermal and solar energy [J].
Tempesti, Duccio ;
Fiaschi, Daniele .
ENERGY, 2013, 58 :45-51
[60]   Energy, Exergy analysis and optimization of solar thermal power plant with adding heat and water recovery system [J].
Vakilabadi, M. Akbari ;
Bidi, M. ;
Najafi, A. F. .
ENERGY CONVERSION AND MANAGEMENT, 2018, 171 :1639-1650