APPLYING MACHINE LEARNING FOR PREDICTIVE ANALYSIS IN PROJECT-BASED DATA: INSIGHTS INTO VARIATION ORDERS

被引:0
作者
Nishat, Mirza Muntasir [1 ]
Ahsan, Aneeq [1 ]
Olsson, Nils O. E. [1 ]
机构
[1] Norwegian Univ Sci & Technol NTNU, Trondheim, Norway
来源
JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION | 2025年 / 30卷
关键词
Machine Learning; Artificial Intelligence; Project-based data. Project management; Variation Orders; Changes; IMPACT;
D O I
10.36680/j.itcon.2025.033
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The complexity of the global supply chain and project execution necessitates advanced methodologies in project management. As industries are generating large amounts of project data, machine learning (ML) algorithms can be a viable tool for addressing predictive analytics and transforming this industry into more digitalization. This study examines the feasibility of leveraging ML models for predicting variation orders (VOs) in an energy construction project through the use of actual project management data. Using historical project data, this study presents the investigative analysis of applying six ML regression models to predict VOs and evaluates the performance of these models using the mean squared error metric. It is observed that various project activities are nonlinear in the impact of the order of variation, which indicates that advanced ML techniques are required when analyzing the order of variation rather than using linear model analysis. Thus, the results underscore the critical role ofML predictive model implementation in improving change management by enabling preemptive detection of potential problems, risk reduction, and more efficient project execution. Moreover, this study will also help to narrow the existing gap between ML-based theoretical applications and practical project management strategies while also demonstrating the efficacy of AI-based decision support systems for on-time project control. The contributions of this study provide a foundation for developing integrated ML models and project management software, fostering data-driven decision making in dynamic project scenarios.
引用
收藏
页码:807 / 825
页数:19
相关论文
共 48 条
[1]  
Ahsan A., 2022, AI in projects-an investigation of use of project-based data for prediction of changes
[2]  
Aldana A., 2021, National Academics
[3]   Explainable Artificial Intelligence (XAI): What we know and what is left to attain Trustworthy Artificial Intelligence [J].
Ali, Sajid ;
Abuhmed, Tamer ;
El-Sappagh, Shaker ;
Muhammad, Khan ;
Alonso-Moral, Jose M. ;
Confalonieri, Roberto ;
Guidotti, Riccardo ;
Del Ser, Javier ;
Diaz-Rodriguez, Natalia ;
Herrera, Francisco .
INFORMATION FUSION, 2023, 99
[4]   Causes of delay in large construction projects [J].
Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia .
Int. J. Proj. Manage., 2006, 4 (349-357) :349-357
[5]   A review of the applications of multi-agent reinforcement learning in smart factories [J].
Bahrpeyma, Fouad ;
Reichelt, Dirk .
FRONTIERS IN ROBOTICS AND AI, 2022, 9
[6]  
Berry WilliamD., 1993, Understanding regression assumptions, V92
[7]  
Botchkarev A, 2019, Interdisciplinary Journal of Information Knowledge and Management, V14, P045, DOI [10.28945/4184, 10.28945/4184, DOI 10.28945/4184]
[8]  
Brownlee J., 2020, MACHINE LEARNING MAS
[9]   How to Address the Data Quality Issues in Regression Models: A Guided Process for Data Cleaning [J].
Camilo Corrales, David ;
Carlos Corrales, Juan ;
Ledezma, Agapito .
SYMMETRY-BASEL, 2018, 10 (04)
[10]   Shield attitude prediction based on Bayesian-LGBM machine learning [J].
Chen, Hongyu ;
Li, Xinyi ;
Feng, Zongbao ;
Wang, Lei ;
Qin, Yawei ;
Skibniewski, Miroslaw J. ;
Chen, Zhen-Song ;
Liu, Yang .
INFORMATION SCIENCES, 2023, 632 :105-129