Research on Dynamic Optimization of a Critical Path Based on Stochastic Duration and the Earned Value Method

被引:0
作者
Cao, Ping [1 ]
Li, Danyang [1 ]
Cao, Zhi [1 ]
Huang, Dinglei [1 ]
Wang, Jiawei [1 ]
机构
[1] Xian Univ Sci & Technol, Sch Architecture & Civil Engn, Xian 710054, Peoples R China
关键词
random duration; EVM; critical paths; dynamic management; PERFORMANCE-MEASUREMENT; VALUE MANAGEMENT; FUZZY APPROACH; MODEL; TIME;
D O I
10.3390/buildings15081285
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Critical paths are widely used in project schedule management, but most existing studies ignore the volatility and dynamic characteristics of project duration, which increases the risk of project implementation. This paper proposes a dynamic optimization model of random duration and the EVM (earned value method) based on critical path technology. The random duration based on a lognormal distribution is introduced into critical path technology, and the completion probability model is established to evaluate the fluctuation of the project completion schedule. Then, the earned value correction model is established and combined with performance indicators to improve the dynamic management system of proactive scheme scheduling and reactive scheme scheduling. The proposed method can fully consider the fluctuation and dynamics of the project duration, effectively reduce the errors caused by the uncertain fluctuation of the duration, and further improve scientific management and reduce management costs.
引用
收藏
页数:25
相关论文
共 31 条
[1]  
[Anonymous], 2005, Practice standard for earned value management
[2]   Improving project forecast accuracy by integrating earned value management with exponential smoothing and reference class forecasting [J].
Batselier, Jordy ;
Vanhoucke, Mario .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (01) :28-43
[3]   Evaluation of deterministic state-of-the-art forecasting approaches for project duration based on earned value management [J].
Batselier, Jordy ;
Vanhoucke, Mario .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2015, 33 (07) :1588-1596
[4]   SEQUENCING TASKS WITH EXPONENTIAL SERVICE TIMES TO MINIMIZE THE EXPECTED FLOW TIME OR MAKESPAN [J].
BRUNO, J ;
DOWNEY, P ;
FREDERICKSON, GN .
JOURNAL OF THE ACM, 1981, 28 (01) :100-113
[5]   A Quantity-Based Method to Predict More Accurate Project Completion Time [J].
Chang, Hsien-Kuan ;
Yu, Wen-Der ;
Cheng, Tao-Ming .
KSCE JOURNAL OF CIVIL ENGINEERING, 2020, 24 (10) :2861-2875
[6]   The Use of a Multiple Risk Level Model to Tackle the Duration of Risk for Construction Activity [J].
Chang, Hsien-Kuan ;
Yu, Wen-der ;
Cheng, Shao-Tsai ;
Cheng, Tao-Ming .
KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (06) :2397-2408
[7]   THE PERT MODEL FOR THE DISTRIBUTION OF AN ACTIVITY TIME [J].
CLARK, CE .
OPERATIONS RESEARCH, 1962, 10 (03) :405-406
[8]   A new interval type-2 fuzzy approach for analyzing and monitoring the performance of megaprojects based on earned value analysis (with a case study) [J].
Eshghi, Amin ;
Mousavi, S. Meysam ;
Mohagheghi, Vahid .
NEURAL COMPUTING & APPLICATIONS, 2019, 31 (09) :5109-5133
[9]   MANUFACTURING PERFORMANCE MEASUREMENT USING FUZZY MULTI-ATTRIBUTE UTILITY THEORY AND Z-NUMBER [J].
Feylizadeh, Mohammad Reza ;
Bagherpour, Morteza .
TRANSACTIONS OF FAMENA, 2018, 42 (01) :37-49
[10]  
Ghanbari A, 2017, EUR J PURE APPL MATH, V10, P1135