Optimizing inventory planning in multi-echelon supply chains under uncertainty: a decision-making approach using review policies

被引:2
作者
Vicente, Joaquim Jorge [1 ,2 ]
Relvas, Susana [1 ]
Barbosa-Povoa, Ana Paula [1 ]
机构
[1] Univ Lisbon, Ctr Management Studies, Inst Super Tecn CEGIST, Ave Rovisco Pais, P-1049001 Lisbon, Portugal
[2] Inst Super Gestao ISG, Ctr Invest Gestao CIGEST, Business & Econ Sch, Lisbon, Portugal
关键词
Supply chain management; inventory planning; review policies; demand uncertainty; decision-making approach; C44; C61; SAFETY STOCKS; GUARANTEED; LOCATION; OPTIMIZATION; MANAGEMENT; MODELS; CONFIGURATION; ALGORITHM; NETWORKS; SYSTEMS;
D O I
10.1080/17509653.2025.2483523
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This study conducts a comparative analysis of three inventory review policies within a multi-stage supply chain framework to determine the best policies to adopt. Optimizing supply chain inventory planning is challenging due to uncertain demand. The problem involves minimizing the overall operating costs and determining the optimal reorder plan for the operational network. Three models are developed, employing a multi-period planning approach that considers supply flows, and inventory levels at facilities. To test the models, a real-world supply chain case study is solved. The uncertain demand faced by retailers is addressed by defining the optimal safety stock that guarantees a given service level at each facility. Using the guaranteed service approach to model time delays in distribution flows, we effectively capture the stochastic nature of demand uncertainty. We developed multi-period planning formulations that indicate the precise amount and timing of inventory replenishments. Additionally, this work emphasizes the importance of lead time in multi-period planning modeling, a topic often overlooked in the literature. The combination of inventory planning with inventory policies enables better operational decisions for supply chain managers. The results obtained allow the decision makers to choose the best inventory policy option based on the conditions of their supply chain.
引用
收藏
页码:477 / 493
页数:17
相关论文
共 57 条
[1]   Extensions to the guaranteed service model for industrial applications of multi-echelon inventory optimization [J].
Achkar, Victoria G. ;
Brunaud, Braulio B. ;
Perezd, Hector D. ;
Musa, Rami ;
Mendez, Carlos A. ;
Grossmann, Ignacio E. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 313 (01) :192-206
[2]   The multi-sourcing location inventory problem with stochastic demand [J].
Amiri-Aref, Mehdi ;
Klibi, Walid ;
Babai, M. Zied .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 266 (01) :72-87
[3]   Finite inventory budgets in production capacity and safety stock placement under the guaranteed service approach [J].
Aouam, Tarik ;
Ghadimi, Foad ;
Vanhoucke, Mario .
COMPUTERS & OPERATIONS RESEARCH, 2021, 131
[4]   Impact of merging activities in a supply chain under the Guaranteed Service Model: Centralized and decentralized cases [J].
Bendadou, Abderrahim ;
Kalai, Rim ;
Jemai, Zied ;
Rekik, Yacine .
APPLIED MATHEMATICAL MODELLING, 2021, 93 :509-524
[5]   A periodic-review modeling approach for guaranteed service supply chains [J].
Bossert, John M. ;
Willems, Sean P. .
INTERFACES, 2007, 37 (05) :420-435
[6]   Inventory policies and safety stock optimization for supply chain planning [J].
Brunaud, Braulio ;
Lainez-Aguirre, Jose M. ;
Pinto, Jose M. ;
Grossmann, Ignacio E. .
AICHE JOURNAL, 2019, 65 (01) :99-112
[7]   Efficient formulations for dynamic warehouse location under discrete transportation costs [J].
Brunaud, Braulio ;
Bassett, Matthew H. ;
Agarwal, Anshul ;
Wassick, John M. ;
Grossmann, Ignacio E. .
COMPUTERS & CHEMICAL ENGINEERING, 2018, 111 :311-323
[8]   Optimization of (R, Q) policies for serial inventory systems using the guaranteed service approach [J].
Chen, Haoxun ;
Li, Peng .
COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 80 :261-273
[9]   An inventory-location model: Formulation, solution algorithm and computational results [J].
Daskin, MS ;
Coullard, CR ;
Shen, ZJM .
ANNALS OF OPERATIONS RESEARCH, 2002, 110 (1-4) :83-106
[10]   Optimising installation (R,Q) policies in distribution networks with stochastic lead times: a comparative analysis of guaranteed- and stochastic service models [J].
De Smet, Niels ;
Aghezzaf, El-Houssaine ;
Desmet, Bram .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (13) :4148-4165