Job shop planning and scheduling of reconfigurable manufacturing systems

被引:1
作者
Imsetif, Jad [1 ]
Nezamoddini, Nasim [1 ]
Aqlan, Faisal [2 ]
机构
[1] Oakland Univ, Ind & Syst Engn, 115 Lib Dr, Rochester, MI 48309 USA
[2] Univ Louisville, Dept Ind Engn, 132 Eastern Pkwy, Louisville, KY 40292 USA
关键词
Reconfigurable manufacturing systems; Mixed integer linear programming; Optimization; Sensitivity analyses; Cost effectiveness; RMS DESIGN; NSGA-II; CONFIGURATION; OPTIMIZATION; GENERATION; ALGORITHM; FLEXIBILITY; RELIABILITY; SELECTION; COST;
D O I
10.1007/s12063-025-00551-2
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The fourth industrial revolution (Industry 4.0) has enabled rapid product variations and technological developments such as reconfigurable manufacturing systems (RMSs). Planning and scheduling in RMS differ from traditional systems; therefore, the manufacturing industry has faced implementation barriers. This research proposes a new mixed-integer linear programming (MILP) formulation for process planning and scheduling in RMSs. The formulation, considers new aspects such as number of products, their quantity and complexity, calibration rate, work-in-process (WIP), and inventory management. Moreover, this research promotes RMS effectiveness for business and provides new insights on the effects of different factors on the overall performance. The applicability of the proposed formulation is illustrated with a case study. The results showed that RMS outperforms a traditional system with 30% savings in cost and up to a 25% increase in demand fulfillment. Sensitivity analyses are conducted to investigate the effect of different parameters on the cost-effectiveness of RMS compared to traditional manufacturing systems. Analysis of variance (ANOVA) highlighted the importance of the reconfigurability of the machines compared to other settings
引用
收藏
页码:891 / 912
页数:22
相关论文
共 82 条
[1]  
Andersen AL, 2020, TAILORED RECONFIGURA, P209, DOI [10.1007/978-3-030-28782-511, DOI 10.1007/978-3-030-28782-511]
[2]   A systematic methodology for changeable and reconfigurable manufacturing systems development [J].
Andersen, Rasmus ;
Napoleone, Alessia ;
Andersen, Ann-Louise ;
Brunoe, Thomas Ditlev ;
Nielsen, Kjeld .
JOURNAL OF MANUFACTURING SYSTEMS, 2024, 74 :449-462
[3]   Configuration selection for a reconfigurable manufacturing flow line involving part production with operation constraints [J].
Ashraf, Masood ;
Hasan, Faisal .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2018, 98 (5-8) :2137-2156
[4]  
Askari R, 2021, MULTIPRODUCT EPQ MOD, P161, DOI [10.1007/978-3-030-89743-710, DOI 10.1007/978-3-030-89743-710]
[5]   Modelling the problem of production scheduling for reconfigurable manufacturing systems [J].
Azab, Ahmed ;
Naderi, Bahman .
9TH CIRP CONFERENCE ON INTELLIGENT COMPUTATION IN MANUFACTURING ENGINEERING - CIRP ICME '14, 2015, 33 :76-80
[6]   Extended Production Planning of Reconfigurable Manufacturing Systems by Means of Simulation-based Optimization [J].
Behrendt, Sebastian ;
Wurster, Marco ;
May, Marvin Carl ;
Lanza, Gisela .
PROCEEDINGS OF THE CONFERENCE ON PRODUCTION SYSTEMS AND LOGISTICS, CPSL 2023-1, 2023, :210-220
[7]   Modularity assessment in reconfigurable manufacturing system (RMS) design: an Archived Multi-Objective Simulated Annealing-based approach [J].
Benderbal, Hichem Haddou ;
Dahane, Mohammed ;
Benyoucef, Lyes .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2018, 94 (1-4) :729-749
[8]   Flexibility-based multi-objective approach for machines selectioninreconfigurable manufacturing system (RMS) design underunavailabilityconstraints [J].
Benderbal, Hichem Haddou ;
Dahane, Mohammed ;
Benyoucef, Lyes .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (20) :6033-6051
[9]   A new heuristic for integrated process planning and scheduling in reconfigurable manufacturing systems [J].
Bensmaine, A. ;
Dahane, M. ;
Benyoucef, L. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (12) :3583-3594
[10]  
Bensmaine A., 2012, IFAC Proceedings Volumes, V45, P560, DOI DOI 10.3182/20120523-3-RO-2023.00349