共 48 条
[41]
Sharma K., Trivedi M.K., Modelling the resource constrained time-cost-quality-safety risk-environmental impact trade-off using opposition-based NSGA III, Asian Journal of Civil Engineering, 24, 8, pp. 3083-3098, (2023)
[42]
Sharma K., Trivedi M.K., Statistical analysis of delay-causing factors in indian highway construction projects under hybrid annuity model, Transportation Research Record, 2677, 10, pp. 572-591, (2023)
[43]
Tizhoosh H.R., Opposition-based learning: a new scheme for machine intelligence, Proceedings—international conference on computational intelligence for modelling, control and automation, CIMCA 2005 and international conference on intelligent agents, web technologies and internet, (2005)
[44]
Trivedi M.K., Sharma K., Construction Time–Cost–Resources–Quality Trade-Off Optimization Using NSGA-III, Asian Journal of Civil Engineering, 24, 8, pp. 3543-3555, (2023)
[45]
Xie W., Research on construction quality management of civil engineering for highway traffic, International Conference on Advanced Education Service and Management, 3, pp. 856-859, (2019)
[46]
Yang J., Multi-objective optimization of construction project based on multi ant colony algorithm, Advances in Intelligent Systems and Computing, 1146, pp. 768-774, (2020)
[47]
Zhang H., Li H., Tam C.M., Heuristic scheduling of resource-constrained, multiple-mode and repetitive projects, Construction Management and Economics, 24, 2, pp. 159-169, (2006)
[48]
Zhou J., Love P.E.D., Wang X., Teo K.L., Irani Z., A review of methods and algorithms for optimizing construction Scheduling, Journal of the Operational Research Society, 64, 8, pp. 1091-1105, (2013)