Experimental study on seismic performance of assembled steel fully recycled concrete frame structure

被引:0
|
作者
Chen, Yuliang [1 ,2 ,3 ]
Wang, Shuangyi [1 ]
Liu, Jie [1 ]
Jiang, Rui [1 ]
Ye, Peihuan [1 ,2 ]
机构
[1] School of Civil Engineering and Architecture, Guangxi University of Science and Technology, Liuzhou,545006, China
[2] Guangxi Engineering Research Center for Safety Prevention and Control of Assembly Structure, Guangxi University of Science and Technology, Liuzhou,545006, China
[3] Key Laboratory of Disaster Prevention & Mitigation and Prestress Technology, Guangxi Colleges and Universities, Guangxi University of Science and Technology, Liuzhou,545006, China
来源
关键词
Arches - Bearings (structural) - Building moving - Columns (structural) - Concrete beams and girders - Concrete buildings - Cyclic loads - Electric towers - Fracture mechanics - Religious buildings - Seismic response - Shotcreting - Solar buildings - Water towers;
D O I
10.13465/j.cnki.jvs.2025.08.023
中图分类号
学科分类号
摘要
In order to study the seismic performance of the assembled steel fully recycled concrete frame-recycled concrete infilled wall structure, a cast-in-place steel reinforced concrete frame (control group) and two assembled steel reinforced recycled concrete frames with a scale ratio of 1: 2. 5 were designed. The mechanical properties such as hysteresis curve, skeleton curve, stiffness degradation, energy dissipation capacity, strength degradation and inter-story displacement angle of assembled steel reinforced fully recycled concrete were investigated by low cyclic loading test. The results show that the failure modes of the assembled steel fully recycled concrete frame and the cast-in-place ordinary concrete frame are similar, both of which are manifested as the failure of the plastic hinge zone at the beam end and the column bottom. The stiffness degradation of prefabricated steel reinforced recycled concrete frame is more obvious than that of cast-in-place ordinary concrete frame, and the maximum reduction is about 62. 54%. The energy dissipation capacity of the prefabricated steel reinforced recycled concrete frame with infill wall is the best, which is about 22. 22% higher than that of the cast-in-place steel reinforced concrete frame. The strength degradation coefficient of cast-in-place ordinary steel reinforced concrete frame and assembled steel reinforced recycled concrete frame is between 0. 89 and 0.91, and the strength degradation coefficient of assembled steel reinforced recycled concrete frame with infilled wall is between 0. 77 and 0. 82. The displacement ductility coefficient of the assembled steel reinforced recycled concrete frame is about 2. 14-4. 63, which is about 118. 40 % higher than that of the cast-in-place ordinary concrete structure. The ultimate inter-story displacement angle of cast-in-place steel ordinary concrete frame and assembled steel recycled concrete frame is between 1/39 and 1/28. The strain test results show that the bearing capacity of the structure is mainly controlled by the normal stress on the section. The plastic hinge begins to form at the beam end, and finally forms at the bottom of the column. The failure belongs to the beam hinge mechanism, which meets the seismic requirements of strong column and weak beam. © 2025 Chinese Vibration Engineering Society. All rights reserved.
引用
收藏
页码:209 / 219
相关论文
共 50 条
  • [1] Experimental studies on seismic performance of fully assembled concrete frame structure with U-shaped dampers
    Lu Y.
    Xue Y.
    Jianzhu Jiegou Xuebao/Journal of Building Structures, 2023, 44 : 240 - 249
  • [2] Experimental study on seismic performance of steel-reinforced recycled concrete frame with infill wall
    Liu, Zuqiang
    Xue, Jianyang
    Qi, Liangjie
    Gao, Liang
    STRUCTURAL DESIGN OF TALL AND SPECIAL BUILDINGS, 2020, 29 (10):
  • [3] Experimental study on seismic performance of seismic-damaged precast steel reinforced (recycled) concrete frame structure after strengthened and repaired
    Chen, Yuliang
    Zhu, Zhen
    Wu, Huiqin
    Liu, Jie
    Zhu, Ling
    Ye, Peihuan
    Journal of Building Engineering, 98
  • [4] Experimental study on seismic performance of seismic-damaged precast steel reinforced (recycled) concrete frame structure after strengthened and repaired
    Chen, Yuliang
    Zhu, Zhen
    Wu, Huiqin
    Liu, Jie
    Zhu, Ling
    Ye, Peihuan
    JOURNAL OF BUILDING ENGINEERING, 2024, 98
  • [5] Study on seismic performance of prestressed fabricated reinforced concrete frame structure assembled by steel sleeves
    Liu, Jiaqi
    Cao, Dafu
    Wang, Kun
    Zhou, Yanling
    Xue, Hanyang
    ENGINEERING STRUCTURES, 2025, 322
  • [6] Seismic Performance of Precast Recycled Concrete Frame Structure
    Xiao, Jianzhuang
    Ding, Tao
    Thi Loan Pham
    ACI STRUCTURAL JOURNAL, 2015, 112 (04) : 515 - 524
  • [7] Experimental study on seismic performance of recycled aggregate concrete filled steel tube column and reinforced recycled aggregate concrete beam frame
    Chen, Zongping
    Zhang, Xianggang
    Xue, Jianyang
    Su, Yisheng
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2014, 47 (10): : 22 - 31
  • [8] Experimental study of the synergistic seismic performance of steel frame filled with assembled lightweight concrete wall panels
    Li Y.
    Gao C.-M.
    Song B.
    Li X.-R.
    Liu C.-H.
    Gongcheng Kexue Xuebao/Chinese Journal of Engineering, 2023, 45 (08): : 1364 - 1375
  • [9] Experimental study on seismic performance of steel reinforced recycled concrete column
    Xue, Jianyang
    Lin, Jianpeng
    Ma, Hui
    ADVANCES IN CIVIL AND STRUCTURAL ENGINEERING III, PTS 1-4, 2014, 501-504 : 1580 - 1586
  • [10] FEA on seismic performance of steel reinforced recycled concrete frame infilled with recycled concrete blocks
    Gao, Liang
    Xue, Jianyang
    Wang, Jinlin
    Jianzhu Jiegou Xuebao/Journal of Building Structures, 2015, 36 : 80 - 86