Model of cost management for the Jakarta Bandung High Speed Railway Project

被引:0
|
作者
Salim, Indra Putra [1 ]
Simanjuntak, Manlian Ronald A. [2 ]
Jin, Oei Fuk [1 ]
机构
[1] Tarumanagara Univ Jakarta, Jl Letjen S Parman 1,RT6-RW16, Jakarta 11440, Indonesia
[2] 17 Agustus 1945 Univ, Jl Sunter Permai Raya,Sunter Agung Kec Tj Priok, Jakarta 14350, Indonesia
关键词
cost management; project management; construction management; high-speed railway; content validity ratio; factor analysis; structural equation modelling; STRUCTURAL EQUATION MODEL;
D O I
10.1680/jmapl.24.00017
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The completion of the Jakarta-Bandung High-speed railway (JBHSR) project in 2023 marks a significant milestone for Indonesia, showcasing enhanced connectivity between two cities of Jakarta and Bandung. Despite facing challenges, particularly in cost management, this study employs content validity ratio, factor analysis and structural equation modelling to address these issues. Surveying 404 stakeholders, it highlights the crucial role of cost planning in project success, aligning with existing literature on similar endeavors. The final model refines 108 cost management attributes as per PMBOK guidelines, namely, cost management process involves planning, estimation, budget determination, and cost control. The outcomes of the final structural equation model underscore the significance of cost control in enhancing both cost efficiency and project success, aligning with findings from literature on similar projects. The novelty of this study lies in its application of content validity ratio, factor analysis and structural equation modelling within the context of high-speed railway projects, adding to the existing literature on infrastructure development in Indonesia. This research offers valuable insights for practitioners and policymakers involved in the planning and execution of large-scale infrastructure projects, potentially leading to enhanced cost efficiency and project success in similar projects in the future.
引用
收藏
页数:45
相关论文
共 50 条
  • [1] Clarifying Misconceptions on The Jakarta-Bandung High-Speed Railway
    Xu Liping
    ChinaReportASEAN, 2023, 8 (10) : 33 - 33
  • [2] Research on the Program of Introducing Jakarta-Bandung High-speed Railway into Jakarta Terminal
    Wu, Bilong
    Journal of Railway Engineering Society, 2022, 39 (06): : 4 - 10
  • [5] Analysis of Shield Tunneling Parameters and Research on Prediction Model of Tunneling Excavation Speed in Volcanic Ash Strata of Jakarta-Bandung High-Speed Railway Project
    Fan, Xiaomin
    Tan, Zhongsheng
    Zhang, Baojin
    Zhao, Jinpeng
    Cao, Yuxin
    Jiang, Yongtao
    APPLIED SCIENCES-BASEL, 2024, 14 (11):
  • [6] Optimal Selection of Earthquake Resisting Schemes for Jakarta-Bandung High-Speed Railway
    Quan, Wei
    Deng, Lin
    Liu, Xuzheng
    Gao, Bibo
    ADVANCES IN CIVIL ENGINEERING, 2022, 2022
  • [7] "Risk is not Measured, but Contested and Compromised": A Case Study of Jakarta-Bandung High-Speed Railway
    Wijaya, Trissia
    JOURNAL OF CONTEMPORARY ASIA, 2024,
  • [8] Information management model of construction schedule risk of high-speed railway project
    Liu, Weiqing
    Chen, Tingru
    Wei, Wanbing
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 426 - 430
  • [9] Dynamic Slope Stability Subject to Blasting Vibrations: a Case Study of the Jakarta-Bandung High-Speed Railway Tunnel
    Widodo
    Phanjaya, Hermawan
    Prassetyo, Simon Heru
    Simangunsong, Ganda Marihot
    Rai, Made Astawa
    Wattimena, Ridho Kresna
    TRANSPORTATION INFRASTRUCTURE GEOTECHNOLOGY, 2023, 10 (05) : 774 - 794
  • [10] Spatiotemporal Patterns and Driving Factors of the Ecological Environmental Quality along the Jakarta-Bandung High-Speed Railway in Indonesia
    Dai, Xin
    Chen, Jianping
    Xue, Chenli
    SUSTAINABILITY, 2023, 15 (16)