Dynamic multi-period recycling collection routing with uncertain material quality

被引:0
|
作者
Cuellar-Usaquen, Daniel [1 ]
Ulmer, Marlin W. [2 ]
Antons, Oliver [3 ,4 ]
Arlinghaus, Julia C. [3 ,4 ]
机构
[1] Univ Andes, Ind Engn Dept, Cra 1 18A-12, Bogota 111711, Colombia
[2] Otto von Guericke Univ, Management Sci, Univ Pl 2, D-39106 Magdeburg, Germany
[3] Otto von Guericke Univ, Prod Syst & Automat, Univ Pl 2, D-39106 Magdeburg, Germany
[4] Fraunhofer Inst Factory Operat & Automat, Sandtorstr 22, D-39106 Magdeburg, Germany
关键词
Routing; Circular economy; Sequential decision process; Stochastic lookahead; LOOP SUPPLY CHAIN; NETWORK DESIGN; REVERSE LOGISTICS; INVENTORY; MANAGEMENT; ALGORITHM; POLICIES; DEMAND; YIELD;
D O I
10.1007/s00291-025-00808-z
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider the problem of collecting and processing waste material. At a production facility, a known amount of inventory is required for production (e.g., paper) for every period. Instead of new material, the facility relies on collected and processed waste material (e.g., paper waste). This material is collected from regional waste collection locations. The amount of waste material per location is uncertain, as is the quality of the collected waste, i.e., the resulting inventory when processing the material. If the inventory is insufficient at the end of a period, costly new material must be bought. Each period, decisions are made about how much waste material to collect from which location and how to route the collection vehicles accordingly. Ideally, inventory is built to hedge against quality uncertainty and to ensure efficient routing operations in future periods. We propose a stochastic lookahead method that samples a set of scenarios and solves a simplified two-stage stochastic program in every period. We show the value of our method for two case studies, one based on real-world data from Sachsen-Anhalt, Germany, and one from the literature with data from the United Kingdom. We further conduct a detailed analysis of our method and the problem characteristics. The results show that our method effectively anticipates all sources of uncertainty, reducing cost significantly compared to benchmark policies. This superior performance is due to appropriate state-dependent supplier selection that considers the percentage of material loss, available material, and routing cost for current and future periods.
引用
收藏
页数:44
相关论文
共 50 条
  • [31] Multi-period liner ship fleet planning with dependent uncertain container shipment demand
    Meng, Qiang
    Wang, Tingsong
    Wang, Shuaian
    MARITIME POLICY & MANAGEMENT, 2015, 42 (01) : 43 - 67
  • [32] MULTI-OBJECTIVE INVENTORY AND ROUTING MODEL FOR A MULTI- PRODUCT AND MULTI-PERIOD PROBLEM OF VETERINARY DRUGS
    Bardeji, Saeideh Farajzadeh
    Fakoor, Amir Mohammad
    Mirghaderi, Seyed-Hadi
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2022, 29 (04): : 464 - 486
  • [33] A MULTI-PERIOD GROUP TECHNOLOGY METHOD FOR DYNAMIC CELLULAR MANUFACTURING SYSTEMS
    Padayachee, J.
    Bright, G.
    SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2016, 27 (04): : 90 - 100
  • [34] A Single-Product Multi-Period Inventory Routing Problem under Intermittent Demand
    Song, Xin
    Chang, Daofang
    Luo, Tian
    INFORMATION, 2023, 14 (06)
  • [35] An adaptive large-neighborhood search heuristic for a multi-period vehicle routing problem
    Dayarian, Iman
    Crainic, Teodor Gabriel
    Gendreau, Michel
    Rei, Walter
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2016, 95 : 95 - 123
  • [36] Solving the integrated multi-period scheduling routing problem for cleaning debris in the aftermath of disasters
    de Castro Pena, Guilherme
    Santos, Andrea Cynthia
    Prins, Christian
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 306 (01) : 156 - 172
  • [37] An approximate dynamic programming method for the multi-period technician scheduling problem with experience-based service times and stochastic customers
    Chen, Xi
    Hewitt, Mike
    Thomas, Barrett W.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2018, 196 : 122 - 134
  • [38] Multi-objective, multi-period location-routing model to distribute relief after earthquake by considering emergency roadway repair
    Vahdani, Behnam
    Veysmoradi, D.
    Shekari, N.
    Mousavi, S. Meysam
    NEURAL COMPUTING & APPLICATIONS, 2018, 30 (03): : 835 - 854
  • [39] A robust multi-supplier multi-period inventory model with uncertain market demand and carbon emission constraint
    Feng, Yuqiang
    Liu, Yankui
    Chen, Yanju
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 165
  • [40] A Multi-Period Multiple Objective Uncertain Programming Model to Allocate Order for Supplier Selection Problem
    Eydi, Alireza
    Fazli, Leyla
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2016, 33 (06)